YEN MY INDUSTRIAL PARK - HUNG YEN
Address: Lieu Xa Commune, Yen My District, Hung Yen Province
Total Area: 280 hectares
Operation Time: 2018 - 2068
Rental Price: 130 USD/m²/lease cycle (excluding VAT)
Strategic Location and Regional Connectivity
l Yen My Industrial Park is conveniently located near Hanoi, situated between the AH14 Trans-Asia Road and the Hanoi - Haiphong Expressway, offering easy connections to airports and seaports.
l About 30 km from Hanoi city center;
l About 45 km from Noi Bai Airport;
l About 95 km from Cat Bi Airport;
l About 100 km from Haiphong Port;
l About 120 km from Cai Lan Port;
l About 50 km from Yen Phong Industrial Park.

Traffic Connection Map of Yen My Industrial Park
Investment Attraction Industries at Yen My Industrial Park
l High-tech applications and the production of high-tech products;
l Manufacturing of electrical equipment, electronics, computers, and optical products;
l Automotive, motorcycle, machinery, and equipment manufacturing;
l Metal products from casting;
l Processing and preservation of meat, fruits, and vegetables; production of beverages;
l Wood products manufacturing;
l Pharmaceuticals;
l Cosmetics;
l Paints;
l Packaging;
l Logistics services, etc.
Infrastructure of Yen My Industrial Park
Electricity Supply
110/22kV power station with a capacity of 7x63 MVA.
Water Supply
The water plant has a capacity of 10,000 m³/day and night.
Wastewater Treatment
The wastewater treatment plant has a capacity of 8,000 m³/day and night.
Fire Prevention and Fighting: The fire hydrant system is arranged along all internal roads. The distance between fire hydrants is 120m - 150m. Fire hydrant diameter: D125mm.
Onsite Service Infrastructure
Bank, police station, warehouse, post office, fuel supply station, clinic...
Investment Incentives at Yen My Industrial Park
l 100% corporate income tax exemption for the first 2 years;
l 50% reduction for the following 4 years.
Investment Process at Yen My Industrial Park
1. Sign a land lease agreement.
2. Apply for an investment registration certificate, and adjust the investment registration certificate (15 days).
3. Apply for a business registration certificate, tax code, and company seal (5 days).
4. Sign a land lease contract (5 days). Agree on connection points (water supply and drainage, wastewater, electricity supply, and gate positions - 5 days). Submit the basic design and construction drawing approval (30 days).
5. Fire prevention and fighting plan approval (15 days). Environmental impact assessment report approval (45 days). Apply for a construction permit (20 days).
6. Build factories, install machinery, and equipment.
7. Apply for the land use right certificate (30 days).
Land Rental Price and Other Costs at Yen My Industrial Park
Land Rental Price with Infrastructure: 130 USD/m²/lease cycle (excluding VAT)
Management Fee: 0.7 USD/m²/year (excluding VAT)
Electricity Price: According to the supplier's regulations
Water Price: According to the supplier's regulations
Wastewater Treatment Fee: According to the supplier's regulations
For partners interested in leasing land to set up factories at Yen My Industrial Park, Hung Yen Province, please contact the Hotline: 1900.888.858 or Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.8997, 106.0562
Videos of this park
This park has no videos yet