CCNNinh Binh

YEN LENH INDUSTRIAL CLUSTER – NINH BINH

1 photos

Key facts

Total area
69.09 ha
Rent
Not updated
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

Overview

YEN LENH INDUSTRIAL CLUSTER – NINH BINH
Address: Duy Tien Ward, Ninh Binh Province
Operation period: 2021 – 2071
Total area: 69.09 ha
Land lease price: 82 – 85 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 86 km from Noi Bai International Airport;
  • About 60 km from Hanoi city center;
  • About 1 km from Thinh Chau Inland Port (Day River);
  • About 103 km from Hai Phong Port.

Infrastructure of Yen Lenh Industrial Cluster

Power Supply System
Substation voltage capacity: 19 MVA

Water Supply System
Water plant capacity: 1,200 m³/day-night. Water column height ≥ 10 meters

Fire Protection System

  • Firefighting system: Conveniently located along clean water supply routes adjacent to main roads.
  • Firefighting equipment: Fully equipped in accordance with regulations.

Wastewater Treatment System
Total treatment capacity: 1,000 m³/day-night

Geological Conditions

  • Slightly variable geology, medium bearing capacity
  • Low groundwater level
  • Hydrological condition: No flood observed with a frequency of once every 30 years.

Industries Attracting Investment in Yen Lenh Industrial Cluster

  • Mechanical manufacturing and assembly;
  • Electrical and electronic equipment;
  • Textile, garment, footwear, and raw material production;
  • Agricultural and food processing;
  • Consumer goods, medical equipment and tools;
  • Supporting industries;
  • Warehousing and logistics services supporting industrial production.

Investment Incentives in Yen Lenh Industrial Cluster
2-year corporate income tax exemption and 50% tax reduction for the following 4 years from the date of taxable income.

Construction density: 50%
Land use coefficient: 1.5 times
Maximum number of floors: 3 floors

Land Lease and Other Fees

  • Infrastructure lease price: 82 – 85 USD/m² (excluding VAT)
  • Wastewater treatment fee: 0.4 USD/m³
  • Clean water price: 0.5 USD/m³ (plus 3% monthly invoice for operation)
  • Electricity price (plus 3% monthly invoice for operation):
    • Production use:
      • Normal hours: 1,809 VND/kWh
      • Off-peak hours: 1,184 VND/kWh
      • Peak hours: 3,314 VND/kWh
    • Service use:
      • Normal hours: 2,870 VND/kWh
      • Off-peak hours: 1,746 VND/kWh
      • Peak hours: 4,937 VND/kWh
  • Infrastructure management fee: 0.5 USD/m²/year

Contact
For land lease and factory development in Yen Lenh Industrial Cluster, Ninh Binh Province, please contact the Business Department via:

Hotline: 1900.888.858
Email: [email protected].

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

20.6284, 106.0163

Videos of this park

Empty

This park has no videos yet

?