CCNNinh Binh
YEN LENH INDUSTRIAL CLUSTER – NINH BINH
.jpg)
1 photos
Key facts
- Total area
- 69.09 ha
- Rent
- Not updated
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
YEN LENH INDUSTRIAL CLUSTER – NINH BINH
Address: Duy Tien Ward, Ninh Binh Province
Operation period: 2021 – 2071
Total area: 69.09 ha
Land lease price: 82 – 85 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 86 km from Noi Bai International Airport;
- About 60 km from Hanoi city center;
- About 1 km from Thinh Chau Inland Port (Day River);
- About 103 km from Hai Phong Port.
Infrastructure of Yen Lenh Industrial Cluster
Power Supply System
Substation voltage capacity: 19 MVA
Water Supply System
Water plant capacity: 1,200 m³/day-night. Water column height ≥ 10 meters
Fire Protection System
- Firefighting system: Conveniently located along clean water supply routes adjacent to main roads.
- Firefighting equipment: Fully equipped in accordance with regulations.
Wastewater Treatment System
Total treatment capacity: 1,000 m³/day-night
Geological Conditions
- Slightly variable geology, medium bearing capacity
- Low groundwater level
- Hydrological condition: No flood observed with a frequency of once every 30 years.
Industries Attracting Investment in Yen Lenh Industrial Cluster
- Mechanical manufacturing and assembly;
- Electrical and electronic equipment;
- Textile, garment, footwear, and raw material production;
- Agricultural and food processing;
- Consumer goods, medical equipment and tools;
- Supporting industries;
- Warehousing and logistics services supporting industrial production.
Investment Incentives in Yen Lenh Industrial Cluster
2-year corporate income tax exemption and 50% tax reduction for the following 4 years from the date of taxable income.
Construction density: 50%
Land use coefficient: 1.5 times
Maximum number of floors: 3 floors
Land Lease and Other Fees
- Infrastructure lease price: 82 – 85 USD/m² (excluding VAT)
- Wastewater treatment fee: 0.4 USD/m³
- Clean water price: 0.5 USD/m³ (plus 3% monthly invoice for operation)
- Electricity price (plus 3% monthly invoice for operation):
- Production use:
- Normal hours: 1,809 VND/kWh
- Off-peak hours: 1,184 VND/kWh
- Peak hours: 3,314 VND/kWh
- Service use:
- Normal hours: 2,870 VND/kWh
- Off-peak hours: 1,746 VND/kWh
- Peak hours: 4,937 VND/kWh
- Infrastructure management fee: 0.5 USD/m²/year
Contact
For land lease and factory development in Yen Lenh Industrial Cluster, Ninh Binh Province, please contact the Business Department via:
Hotline: 1900.888.858
Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.6284, 106.0163
Videos of this park
This park has no videos yet