KCNBac Ninh

XUAN CAM - HUONG LAM INDUSTRIAL PARK PHASE I - BAC NINH

1 photos

Key facts

Total area
102.58 ha
Rent
140*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

XUAN CAM - HUONG LAM INDUSTRIAL PARK PHASE I - BAC NINH 
Address: Xuan Cam Commune, Huong Lam Commune, Hiep Hoa District, Bac Ninh Province 
Operation Period: 2024 - 2074
Area: 102.85 hectares
Land Rental Price: USD 140/m²/lease cycle

Strategic Location and Regional Connectivity

  • Approximately 26 km from Hanoi City Center
  • Approximately 155 km from Lang Son Border Gate
  • Approximately 137 km from Cai Lan Deep-Sea Port
  • Approximately 110 km from Hai Phong Port
  • Approximately 20 km from Noi Bai International Airport

Infrastructure of Xuan Cam - Huong Lam Industrial Park Phase I

Power Supply System
A new 110/22kV substation with a capacity of 2x63MVA will be constructed. Additionally, rooftop solar power systems with a capacity of approximately 45MVA will be added to the industrial park.

Water Supply System
The water supply system will have a capacity of approximately 5,000 m³/day. 

Wastewater Treatment System
A wastewater treatment plant will be built with a capacity of approximately 5,000 m³/day. 

Telecommunication System
A comprehensive telecommunication system will be developed, ensuring seamless connectivity with the national telecommunications and postal system. This system will be constructed underground in synchronization with the road infrastructure. BTS stations will be strategically placed in green areas, medians, or sidewalks, ensuring aesthetic appeal.

Investment-Attractive Sectors in Xuan Cam - Huong Lam Industrial Park Phase I

  • Manufacturing and assembling electrical, electronic, refrigeration, and precision mechanical equipment, as well as high-tech products for electronics and IT industries.
  • Pharmaceutical, cosmetic, vaccine, and medical equipment production.
  • Food and fruit processing.
  • Manufacturing and installing products related to solar rooftop power systems.
  • Production of other goods meeting modern and high-tech production standards.

Investment Incentives at Xuan Cam - Huong Lam Industrial Park Phase I

Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.

Land Rental Price and Other Costs at Xuan Cam - Huong Lam Industrial Park Phase I

  • Infrastructure rental price: USD 140/m²/lease cycle
  • Infrastructure management and maintenance fee: USD 0.6/m²/year
  • Clean water price: USD 0.4/m³
  • Wastewater treatment fee: USD 0.4/m³
  • Electricity price: As per EVN regulations

All prices and fees exclude VAT and are subject to change. Please contact IIP for the latest updates.

Contact

Partners interested in leasing land to set up manufacturing plants at Xuan Cam - Huong Lam Industrial Park Phase I, Bac Ninh Province, please contact the Business Department Hotline: 1900.888.858 or Email: [email protected]. 

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.2871, 105.9362

Videos of this park

Empty

This park has no videos yet

?