KCNBac Ninh

VSIP INDUSTRIAL PARK – BAC NINH

1 photos

Key facts

Total area
635 ha
Rent
150*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

VSIP INDUSTRIAL PARK – BAC NINH
Address: Tu Son Ward, Dai Dong Commune, Bac Ninh Province
Operation Period: 2007 – 2057
Total Area: 635 ha
Land Lease Price: 150 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 20 km from Hanoi city center
  • About 40 km from Noi Bai International Airport
  • About 3 km from Hanoi – Thai Nguyen Expressway
  • About 10 km from Hanoi – Hai Phong Expressway
  • About 120 km from Hai Phong Port

Infrastructure of VSIP Bac Ninh Industrial Park

Power Supply System
A 110kV/22kV transformer station with a capacity of 126 MVA ensures stable power for factories operating in the zone.

Water Supply System
The clean water plant has a capacity of 23,000 m³/day, sourced from the Duong River. It includes two stages:

  • Phase 1: 10,000 m³/day
  • Phase 2: 23,000 m³/day

Wastewater Treatment System
The centralized wastewater treatment plant has a capacity of 17,520 m³/day and ensures discharge meets Column A of Vietnam’s environmental standards.

Telecommunication System
The switchboard provides 27,109 lines, with fiber-optic cables connected to each land lot’s technical cabinet. Signal is supplied directly from Bac Ninh City.

Fire Protection System
Fire hydrants are arranged along each land lot, with a 150m service radius per hydrant. The park has an on-site police and fire station equipped with modern tools and a 24/7 team to handle emergencies promptly.

Key Investment Sectors in VSIP Bac Ninh Industrial Park

  • High-tech industries
  • Telecommunications
  • Electronic components
  • Auto and motorbike parts manufacturing and assembly
  • Logistics and supporting industries
  • Industrial equipment manufacturing

Investment Incentives
Corporate income tax exemption for the first 2 years and a 50% reduction for the next 4 years.

Construction Parameters

  • Maximum construction density: 60%
  • Maximum number of floors: 3
  • Land use ratio: 1.8 times

Land Lease and Fees

  • Infrastructure lease price: 150 USD/m² (excluding VAT)
  • Infrastructure maintenance fee: 0.69 USD/m²/year (excluding VAT)
  • Electricity price: According to EVN’s tariff
  • Clean water price: 13,300 VND/m³
  • Telecom fees: Based on providers’ rates at installation
  • Wastewater treatment fee: 0.4 USD/m³

Contact
For leasing land and establishing factories in VSIP Bac Ninh Industrial Park, please contact:
Hotline: 1900 888 858 | Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.0779, 105.9670

Videos of this park

Empty

This park has no videos yet

?