KCNBac Ninh
VSIP II INDUSTRIAL PARK – BAC NINH

1 photos
Key facts
- Total area
- 273.22 ha
- Rent
- 180*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
VSIP II INDUSTRIAL PARK – BAC NINH
Address: Tam Giang and Yen Phong Communes, Bac Ninh Province
Operation Period: 2019 – 2069
Total Area: 273.22 ha
Land Lease Price: 180 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 43 km from Hanoi city center
- About 18 km from Noi Bai International Airport
- About 12 km from Samsung Bac Ninh factory
- About 147 km from Hai Phong Port
Infrastructure of VSIP II Bac Ninh Industrial Park
Power Supply System
The power source is supplied from the 110/35/22kV Yen Phong 2 substation with a capacity of 63 MVA. 22kV lines are branched and run along internal roads, reaching each land plot.
Water Supply System
Clean water is supplied by an on-site treatment plant with a capacity of 95,000 m³/day, sourced from the Cau River.
Wastewater Treatment System
The centralized wastewater treatment system has a designed capacity of 6,700 m³/day and ensures treated water meets Column A of Vietnam’s environmental standards.
Telecommunication System
The telecom network is installed in underground technical ducts, capable of supporting over 10,000 subscriber lines.
Internal Transportation System
The main road has a cross-section width of 77 m, with 10.5 m wide lanes on each side and a 34 m wide central landscape water canal flanked by green corridors. Branch roads range from 22.5 m to 55 m wide, all with sidewalks and trees, providing both greenery and smooth circulation.
Key Investment Sectors in VSIP II Bac Ninh
- High-tech & electronics
- Supporting industries for auto and mechanical engineering
- Logistics & warehousing
- Pharmaceuticals & medical equipment
- Food & beverages (F&B)
- Clean & green technology industries
Investment Incentives
Corporate income tax exemption for the first 2 years and a 50% reduction for the next 4 years.
Construction Parameters
- Maximum construction density: 70%
- Maximum height: 3 floors
- Land use ratio: 2.1 times
Land Lease and Fees
- Infrastructure lease price: 180 USD/m² (excluding VAT)
- Infrastructure maintenance & management fee: 0.7 USD/m²/year (excluding VAT)
- Electricity price: Based on EVN’s tariff
- Clean water price: 0.4 USD/m³
- Telecom fees: As per provider’s rate at the time of installation
- Wastewater treatment fee: 0.4 USD/m³
Contact
For land lease and factory setup in VSIP II Bac Ninh Industrial Park, please contact:
Hotline: 1900 888 858 | Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.2238, 105.9372
Videos of this park
This park has no videos yet