VSIP HAI PHONG INDUSTRIAL PARK - HAI PHONG

1 photos
Key facts
- Total area
- 1,566.3 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
VSIP HAI PHONG INDUSTRIAL PARK - HAI PHONG
Address: Tan Duong Commune, Thuy Nguyen District, Hai Phong City
Operating period: 2008 - 2058
Total area: 1,566.33 ha
Land rental price: 110 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- Approximately 118 km from Hanoi city center
- Approximately 136 km from Noi Bai International Airport
- Approximately 15 km from Cat Bi International Airport
- Approximately 20 km from Dinh Vu Port
- Approximately 22 km from CT04 Expressway
Infrastructure of VSIP Hai Phong Industrial Park
Power Supply System
The industrial park’s electricity supply comes from Hai Phong Thermal Power Plant via a 110kV transmission line through three 110/22kV substations with a total power capacity of approximately 210.9 MVA.
Water Supply System
The clean water production station has a capacity of 69,000 m³/day, sourced from Gia River, and is supplied to each land plot in the industrial park through a ring-shaped pipeline network combined with a dead-end network.
Wastewater Treatment System
The wastewater treatment system has a capacity of 47,000 m³/day, meeting environmental standards before being discharged into the Cam River.
Internal Traffic System
- The main axis of the industrial park has a cross-section width of 60m - 78m, with a roadway width of 36m, a median strip of 10m, and sidewalks of 7m on each side.
- The branch roads within the industrial park have a cross-section width of 20m - 26m - 36m - 50m, with a roadway width ranging from 15m - 30m, and all branch roads are built with 5m-wide sidewalks on both sides.
Investment Sectors in VSIP Hai Phong Industrial Park
- Information technology
- Electronics
- Pharmaceuticals...
Investment Incentives in VSIP Hai Phong Industrial Park
- Exemption from corporate income tax for the first 4 years and a 50% reduction in payable tax for the following 9 years.
Land Rental and Other Fees in VSIP Hai Phong Industrial Park
- Land rental price (with infrastructure): 110 USD/m² (excluding VAT)
- Infrastructure management fee: 0.5 USD/m²/year (excluding VAT)
- Clean water price: 0.4 USD/m³
- Wastewater treatment fee: 0.3 USD/m³
- Electricity price:
- Normal hours: 1,555 VND/kWh
- Peak hours: 2,871 VND/kWh
- Off-peak hours: 1,007 VND/kWh
Contact Information
For land lease inquiries and factory setup in VSIP Hai Phong Industrial Park, Hai Phong province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.9055, 106.6731
Videos of this park
This park has no videos yet