Total area
260 ha
Rent
Not updated
Occupancy
Not updated
Year established
2011
Investor
Not updated
Management unit
Not updated

Overview

VINH LOC 2 INDUSTRIAL PARK - TAY NINH 

​Address: My Yen Commune, Tay Ninh Province 

​Total area: 260 ha

​Operation time: 2011 - 2061

​Rental price: 250 USD/m2/lease cycle (excluding VAT)

Strategic location and regional connectivity

l Vinh Loc 2 Industrial Park is located at what is considered the western gateway of Ho Chi Minh City to the southwestern provinces and vice versa. It borders Ho Chi Minh City and has a main entrance adjacent to National Highway 1, offering convenience for various types of transportation. Additionally, the Saigon - Trung Luong expressway runs closely behind the industrial park.

l About 24 km from the city center;

l About 30 km from Tan Son Nhat Airport;

l About 15 km from An Lac Intersection (connecting to East-West Boulevard);

l About 9 km from Nguyen Van Linh Intersection (connecting to National Highway 1A);

l About 20 km from Phu My Hung Urban Area;

l About 25 km from Saigon Port;

l About 5 km from Bourbon Port (Ben Luc).

i.jpg

Location connection diagram of Vinh Loc 2 Industrial Park

Industries attracting investment in Vinh Loc 2 Industrial Park

l Garment industry, garment accessories, knitwear;

l Production of consumer goods, plastics, chemicals, educational and medical equipment and tools, household items, pharmaceuticals, cosmetics, footwear (manufacturing and processing);

l Electrical, refrigeration, electronics, telecommunications equipment, and information technology;

l Precision engineering - CNC, machine manufacturing, agricultural machinery, printing, mold processing;

l Processing agriculture, forestry, seafood, grains, animal feed, food, beverages, and confectionery;

l Manufacturing lightweight materials, interior decoration, wood - fine handicrafts, building materials, packaging (paper, plastic, glass, etc.).

Infrastructure at Vinh Loc 2 Industrial Park

Power supply system

​Electricity is supplied from the national grid through the 110/22kV Go Den substation.

Water supply system

l Phase 1 water supply plant with a capacity of 5,000 - 7,000 m3/day-night.

l Phase 2 water supply plant with a capacity of up to 7,000 - 12,000 m3/day-night.

Wastewater treatment system

​Phase 1 wastewater treatment plant capacity is 2,000 m3/day-night.

Traffic system

l The main trunk road has a width of 30 - 47m.

l Branch roads have a width of 8 - 20m.

Investment incentives at Vinh Loc 2 Industrial Park

l Corporate income tax (CIT) exemption for the first 2 years and a 50% reduction in tax payable for the next 4 years.

l Enterprises benefit from preferential import-export tax policies according to Decree No. 87/2010/ND-CP dated August 13, 2010.

Investment support at Vinh Loc 2 Industrial Park

l Free support for investment license application procedures at the Long An Economic Zone Management Board (maximum of 10 days);

l Flexible investment attraction policies tailored to customer needs (in terms of price, fee schedule, installment & payment conditions);

l Investment consulting and support procedures following a simple and quick process;

l Bank loan consulting and support procedures;

l Design consulting, construction support & free assistance with construction permits, environmental impact assessment commitments, and fire prevention and fighting plans;

l Support for land use rights certificate issuance procedures (maximum of 17 days);

l Support for issuance of construction ownership certificates (maximum of 30 days);

l Provision of utility services;

l Support for improving the life of workers (building dormitories, trade services, healthcare, kindergartens, schools, and developing connected residential clusters).

Land rental rates and other costs at Vinh Loc 2 Industrial Park

Land rental price with infrastructure: 250 USD/m2/lease cycle

​Infrastructure management fee: 0.4 USD/m2/year

​Wastewater treatment fee: 0.28 USD/m3

​Water fee: 0.4 USD/m3

​Electricity price:

l Peak hours: 0.1 USD/kWh

l Normal hours: 0.05 USD/kWh

l Off-peak hours: 0.03 USD/kWh

The above rates and fees do not include VAT and may change. Please contact IIP for the latest updates.

Contact:

Partners interested in renting land to build factories at Vinh Loc 2 Industrial Park, please contact the hotline: 1900.888.858 or Email: [email protected]. 

 

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

10.6359, 106.5193

Videos of this park

Empty

This park has no videos yet

?