KCNHo Chi Minh City

VAN THUONG INDUSTRIAL PARK - HO CHI MINH

1 photos

Key facts

Total area
387 ha
Rent
Not updated
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

Overview

VAN THUONG INDUSTRIAL PARK - HO CHI MINH 
Address: Tan Hai Ward, Ho Chi Minh City 

Operation period: 2025 - 2075 
Area: 450 ha
Land Rental Price: 120 - 130 USD/m²

Strategic Location and Regional Connectivity

From the industrial park, connectivity to major industrial zones and urban centers is as follows:

  • Approximately 10km from Vung Tau City Center;
  • Approximately 60km from Long Thanh International Airport;
  • Approximately 90km from Ho Chi Minh City Center;
  • Approximately 100km from Saigon Railway Station.

Infrastructure at Van Thuong Industrial Park

Power Supply System
The 110kV Van Thuong substation receives power directly from Ba Ria Power Plant through a branch line from the 110kV Ba Ria - Phu My transmission line. This branch line is 6km long, featuring a single AC-240 overhead circuit.

Water Supply System
Water supply for Van Thuong Industrial Park is provided by Chau Duc Water Supply Joint Stock Company and Ba Ria – Vung Tau Water Supply Joint Stock Company. The water supply network within the park consists of pipelines ranging from D100mm to D400mm, ensuring a minimum pressure of 1.3 Kg/cm² and a standard water flow speed of 0.6 to 1.2 m/s.

Wastewater Treatment System
The wastewater drainage system in the industrial park is divided into two parts:

  • An internal system in each factory for pre-treatment of special waste;
  • An external collection system that channels wastewater to a centralized treatment plant for secondary cleaning to meet TCVN standards before being discharged into the environment.

Waste Management System
Solid waste is collected, gathered, and transported to designated treatment facilities in accordance with regulations.

Internal Traffic System

  • Main roads: 4 lanes
  • Branch roads: 2 lanes

Investment Sectors at Van Thuong Industrial Park

  • Electrical and electronics industries;
  • Information technology;
  • Mechanical engineering;
  • Medical equipment;
  • Pharmaceutical and chemical industries;
  • Food and beverage processing;
  • Non-polluting industries.

Investment Incentives at Van Thuong Industrial Park

  • Corporate income tax exemption for the first 2 years and a 50% reduction in tax payable for the following 4 years.

Land Rental Prices and Fees at Van Thuong Industrial Park

  • Infrastructure rental price: 120 - 130 USD/m²/lease cycle
  • Management fee: 0.8 USD/m²/year
  • Wastewater management fee: 0.5 USD/m²
  • Water price: 0.5 USD/m³
  • Electricity price:
    • Normal hours: 1,555 VND/kWh
    • Peak hours: 2,871 VND/kWh
    • Off-peak hours: 1,007 VND/kWh

Note: The above prices and fees exclude VAT and are subject to change. Please contact IIP for the latest updates.

Contact

For partners interested in leasing land for manufacturing facilities at Van Thuong Industrial Park, Ho Chi Minh City, please contact: 
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

10.5863, 107.0720

Videos of this park

Empty

This park has no videos yet

?