TRUNG SON – NINH SON INDUSTRIAL CLUSTER – BAC NINH

1 photos
Key facts
- Total area
- 75 ha
- Rent
- 120*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TRUNG SON – NINH SON INDUSTRIAL CLUSTER – BAC NINH
Address: Van Ha Ward, Bac Ninh Province
Operation period: 2020 – 2070
Total area: 75 ha
Land rental price: 120 USD/m² (VAT excluded)
Strategic location and regional connectivity
- Approximately 17 km from Bac Ninh City center;
- Approximately 52 km from Hanoi city center;
- Approximately 47 km from Noi Bai International Airport;
- Approximately 150 km from Hai Phong Port.
Infrastructure of Trung Son – Ninh Son Industrial Cluster
Power supply system
Electricity is supplied from the medium-voltage feeder connected to the 110kV Tien Ninh substation.
Water supply system
Total water demand for the planned area is approximately 1,325 m³/day/night.
Wastewater treatment system
Centralized wastewater treatment plant with a capacity of approximately 1,000 m³/day/night.
Internal traffic system
Main roads with a width of 32 m; branch roads with a width of 28 m.
Fire prevention and fighting system
Fire hydrants are installed at intersections and junctions along sidewalks, with spacing not exceeding 150 m. Water pressure at hydrants is over 10 meters of water column, and hydrants are placed 1 m from the road edge.
Target investment sectors
- Electrical and electronic industries;
- Telecommunications;
- Mechanical engineering;
- Supporting industries;
- Medical equipment and pharmaceuticals;
- Agricultural and food processing.
Investment incentives
In accordance with current regulations of Vietnamese law.
Building density: 70%
Maximum building height: 3 floors
Land-use coefficient: 2.1 times
Land rental rates and service fees
- Infrastructure rental fee: 120 USD/m² (VAT excluded)
- Management fee: 0.5 USD/m²/year (VAT excluded)
- Water price: 0.4 USD/m³
- Wastewater treatment fee: 0.4 USD/m³
- Electricity price: According to supplier regulations
- Telecommunications charges: According to supplier regulations
Contact
Investors wishing to lease land to build factories at Trung Son – Ninh Son Industrial Cluster, Bac Ninh Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.2412, 106.0700
Videos of this park
This park has no videos yet