TRAN ANH - TAN PHU INDUSTRIAL PARK - TAY NINH
.jpg)
1 photos
Key facts
- Total area
- 262 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- 2011
- Investor
- Not updated
- Management unit
- Not updated
Overview
TRAN ANH - TAN PHU INDUSTRIAL PARK - TAY NINH
Address: Hiep Hoa Commune, Tay Ninh Province
Operation period: 2011 - 2061
Total area: 262 ha
Rental price: 110 USD/m²/lease term (excluding VAT, includes one-time land tax payment for the entire lease term)
Strategic Location and Regional Connectivity
Located on the frontage of Provincial Road 830, Tran Anh - Tan Phu Industrial Park benefits from the gateway connecting the Northwest - Southwest regions to Ho Chi Minh City through Ring Roads 3 and 4. Following National Highway 22, it is linked with the economic corridor Ho Chi Minh City - Moc Bai, facilitating easy access to major transportation hubs:
l 42km from Ho Chi Minh City;
l 33km from Tan Son Nhat Airport;
l 58km from Long Thanh Airport;
l 52km from Hiep Phuoc Port;
l 59km from Long An International Port;
l 36km from Ben Luc - Long Thanh Port.
Location Connectivity Map of Tran Anh - Tan Phu Industrial Park
Industries Attracting Investment in Tran Anh - Tan Phu Industrial Park
l Mechanical engineering;
l Electronics and telecommunications;
l Wood processing, glass, ceramics production;
l Textile, dyeing, garment industries;
l Energy, radiation sectors;
l Production of wires, cables, generators;
l Paper and office supplies manufacturing;
l Building materials production;
l Chemical, pharmaceutical, cosmetics industries;
l Production of fertilizers, pesticides;
l Livestock, poultry, and seafood processing;
l Food and beverage processing;
l Livestock, poultry, and seafood breeding and processing.
Infrastructure of Tran Anh - Tan Phu Industrial Park
Electricity supply
Initially powered by the 110kV/22kV-25MVA Duc Hue substation, later phases include the construction of a 110/22kV - 2x20MVA substation within the industrial park.
Water supply
Sourced from local groundwater, with a pumping station providing 3,000 m³/day in the first phase.
Traffic system
Main roads are 70m wide, with secondary roads ranging from 20-30m.
Wastewater treatment system
The treatment plant has a capacity of 2,900 m³/day.
Investment Incentives in Tran Anh - Tan Phu Industrial Park
Corporate income tax exemption for the first 2 years and a 50% reduction for the next 4 years.
Perspective of a Part of Cau Cang Phuoc Dong Industrial Park
Investment Procedure at Tran Anh - Tan Phu Industrial Park
1. Survey and select a land plot.
2. Sign an agreement (reservation) for land lease/purchase and sign a principal contract for lease/transfer.
3. Establish a company.
4. Land handover.
5. Design, apply for construction permits, environmental impact assessment (EIA), fire prevention approval, and start construction.
6. Sign land use rights transfer or lease contract and complete remaining payments.
Land Rental Rates and Other Costs in Tran Anh - Tan Phu Industrial Park
Infrastructure rental price: 110 USD/m²/lease term
Land tax: Paid one-time by the investor for the entire lease term
Management fee: 10,254 VND/m²/year
Wastewater treatment fee: 10,454 VND/m³
Clean water price: 10,046 VND/m³