CCNNinh Binh
TRAC VAN INDUSTRIAL CLUSTER – NINH BINH

1 photos
Key facts
- Total area
- 56.65 ha
- Rent
- Not updated
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
TRAC VAN INDUSTRIAL CLUSTER – NINH BINH
Address: Duy Tien Ward, Ninh Binh Province
Operation period: 2022 – 2072
Total area: 56.65 ha
Land lease price: 95 – 105 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 60 km from Hanoi city center
- About 90 km from Noi Bai International Airport
- Adjacent to National Highway 38B bypass
- About 6 km from Hanoi – Ninh Binh Expressway access
- About 2 km from Yen Lenh Port on the Red River
- About 130 km via waterway from Yen Lenh Port to Hai Phong Port
- About 100 km from Hai Phong Port
- About 140 km from Cai Lan Port – Quang Ninh
- About 10 km from Dong Van Railway Station
Infrastructure of Trac Van Industrial Cluster
Electricity Supply
Electricity is supplied stably and continuously from the 110/35 kV substation at Hoa Mac Industrial Park, Duy Tien Town, Ha Nam Province. Power lines run along internal roads. Enterprises invest in and build step-down substations based on their usage needs.
Water Supply
Clean water is sourced from the Red River Water Plant, with a supply capacity of 31,000 m³/day-night, delivered directly to each land lot’s boundary.
Drainage System
Rainwater and wastewater drainage systems are separated. Rainwater is collected through a system of culverts and drained into canals and rivers. Wastewater must be pre-treated by factories to at least grade B (as per EIA) before being transferred to the cluster’s centralized wastewater treatment plant. Final treatment is to grade A before discharge into the environment.
Traffic System
The internal road system is designed to ensure convenient access to every plot:
- Main roads: 38 m wide
- Branch roads: 20.5 m wide
- Lighting systems are installed along all roads.
Fire Protection System
Water supply and fire hydrants are arranged along the internal roads.
Telecommunications and Postal System
International-standard telecom infrastructure from major service providers is in place, ready to meet domestic and international communication needs. Underground fiber optic cables connect directly to enterprise boundaries.
Environment and Green Spaces
Green areas account for 11% of the total cluster area, combining centralized and roadside greenery to enhance the overall landscape.
Key Industries Attracting Investment
- Supporting industries, electronics, mechanical engineering
- Warehousing and logistics
- Construction materials manufacturing
- Agro-forestry processing, animal feed production
- Other industrial sectors
Investment Incentives at Trac Van Industrial Cluster
- Corporate income tax: According to national regulations
- Import tax: According to national regulations
Construction density: 70%
Maximum building height: 5 floors
Land use coefficient: 3.5 times
Land Lease Price and Related Fees
- Infrastructure lease price: 95 – 105 USD/m² (excluding VAT)
- Wastewater treatment fee: 12,000 VND/m³
- Clean water: As per supplier rates
- Electricity: According to EVN rates
- Infrastructure management fee: 0.7 USD/m²/year
Contact
For land lease and factory development in Trac Van Industrial Cluster, Ninh Binh Province, please contact:
Hotline: 1900.888.858
Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.6333, 106.0024
Videos of this park
This park has no videos yet