KCNGia Lai
TRA DA INDUSTRIAL PARK – GIA LAI

1 photos
Key facts
- Total area
- 213 ha
- Rent
- 55*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TRA DA INDUSTRIAL PARK – GIA LAI
Address: Pleiku Ward, Bien Ho Commune, Gia Lai Province
Operation Period: 2006 – 2056
Total Area: 213 ha
Land Rental Price: 55 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 5 km from Pleiku Airport;
- About 2 km from National Highway 19;
- About 4 km from National Highway 14;
- About 166 km from Quy Nhon seaport.
Infrastructure of Tra Da Industrial Park
Traffic System
Main road width: 15 m, internal road width: 7.5 m, load capacity: 30 tons; directly connected to Ngo Quyen Street, with convenient access to key national routes such as NH 19 and NH 14.
Power Supply System
Connected to the national power grid.
Water Supply System
Exploitation capacity of 2,678 m³/day-night, ensuring sufficient water supply for production and business projects.
Wastewater Treatment System
Wastewater is treated to meet QCVN 40:2011/BTNMT (Type B - National Technical Regulation on Industrial Wastewater) before being discharged into the environment.
A centralized wastewater treatment plant has been built with a capacity of 2,000 m³/day-night.
Telecommunications System
A reliable telecommunications network ensures domestic and international connectivity.
Investment-attracting Industries at Tra Da Industrial Park
- Agro-forestry product processing and biofuel production industries;
- Food processing and consumer goods industries;
- Animal feed production, chemical industry, agro-forestry processing;
- Mechanical engineering, electrical, electronics, and low-pollution industries.
Investment Incentives at Tra Da Industrial Park
- Preferential corporate income tax rate of 10% for 15 years;
- 4 years of tax exemption and 50% tax reduction for the following 9 years;
- Full land rental exemption for the entire 50-year lease term.
Construction Density: 60%
Maximum Number of Floors: 3
Land Use Coefficient: 1.8
Land Rental Price and Other Fees at Tra Da Industrial Park
- Infrastructure rental: 60 USD/m² (excluding VAT)
- Management fee: 0.5 USD/m²/year (excluding VAT)
- Wastewater treatment fee: According to the supplier's pricing
- Water price: According to the supplier's pricing
- Electricity price: According to EVN’s pricing
Contact
Partners interested in leasing land for setting up a manufacturing facility at Tra Da Industrial Park, Gia Lai Province, please contact Hotline: 1900.888.858 or Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
14.0194, 108.0317
Videos of this park
This park has no videos yet