KCNBac Ninh

TIEN SON - NINH SON INDUSTRIAL PARK PHASE 1 - BAC NINH

1 photos

Key facts

Total area
89.57 ha
Rent
140*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

TIEN SON - NINH SON INDUSTRIAL PARK PHASE 1 - BAC NINH 
Address: Van Ha Ward, Bac Ninh Province 
Operating period: 2025 – 2075
Total area: 89.57 ha
Land rental price: 140 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • Approximately 40 km from Hanoi City Center
  • Approximately 45 km from Noi Bai International Airport
  • Approximately 100 km from Dinh Vu Port
  • Approximately 110 km from Lach Huyen Port
  • Approximately 15 km from Bac Giang Railway Station

Infrastructure of Tien Son – Ninh Son Industrial Park Phase 1
Power Supply:
Connected to the national grid via the provincial intermediate substation. On-site substations meet industrial production demand. Medium-voltage power (22kV) is delivered to factory fences.
Water Supply:
Sourced from Bac Giang Province's central water plant, with a supply capacity of approximately 6,000–10,000 m³/day.
Wastewater Treatment:
Equipped with a centralized wastewater treatment plant, with a design capacity of 2,000–3,000 m³/day.
Firefighting System:
Fire hydrants are installed along internal roads in accordance with regulations. The park has a comprehensive fire prevention plan and coordinates with local and provincial firefighting forces.

Targeted Investment Sectors

  • Electrical and electronic industries
  • Mechanical engineering and machinery manufacturing
  • Supporting industries
  • Textile and footwear industries
  • Light and consumer industries
  • Clean and high-tech industries

Investment Incentives
According to current legal regulations

Land Lease and Other Costs

  • Infrastructure land rental price: 140 USD/m² (excluding VAT)
  • Management fee: 0.6 USD/m²/year (excluding VAT)
  • Wastewater treatment fee: According to the provider’s pricing
  • Electricity price: According to EVN pricing
  • Water price: According to the provider’s pricing
  • Telecommunication charges: According to provider's rates at installation time

Contact
For land lease and factory setup at Tien Son – Ninh Son Industrial Park Phase 1, Bac Ninh Province, please contact Hotline: 1900.888.858 or Email: [email protected] 

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.2265, 106.0721

Videos of this park

Empty

This park has no videos yet

?