THUY NGUYEN INDUSTRIAL PARK – PHASE I – HAI PHONG

1 photos
Key facts
- Total area
- 247.8 ha
- Rent
- 120*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
THUY NGUYEN INDUSTRIAL PARK – PHASE I – HAI PHONG
Address: Bach Dang Ward, Nam Trieu Ward, Hoa Binh Ward, Hai Phong City
Operation period: 2025 – 2075
Total area: 247.8 ha
Land lease price: 120 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity:
- Approx. 18 km from Hai Phong City Center
- Approx. 121 km from Hanoi Capital Center
- Approx. 139 km from Noi Bai International Airport
- Approx. 24 km from Cat Bi Airport
- Approx. 16 km from Hai Phong Port
Infrastructure of Thuy Nguyen Industrial Park – Phase I
Traffic system
The main internal roads are about 35–41 m wide, with branch roads 20–24 m wide, fully equipped with sidewalks, trees, lighting, and a drainage system along the roads.
Power supply system
110 kV/22 kV transformer station with an expected capacity of 2x63 MVA, meeting increasing electricity demand in the industrial park.
Water supply system
The water supply capacity for the entire park is approx. 20,000 m³/day and night.
Wastewater treatment system
The centralized wastewater treatment station has a capacity of approx. 15,000 m³/day and night.
Telecommunications system
Integrated “One Stop Shop” telecommunications network including high-speed Internet, Cloud, Voice IP, M&E, etc., with standby technicians and backup transmission lines ensuring uninterrupted operations.
Fire prevention & fighting system
The system is deployed throughout the main roads, with fire hydrants, water systems, specialized firefighting vehicles, and a professionally trained safety team.
Investment-attracted Industries
- High-tech, clean technology, and innovation;
- Small & medium enterprises, creative startups;
- Supporting and commercial services;
- Supporting industries and precision mechanics;
- Textile, garment, footwear;
- Renewable energy products and related components;
- Packaging, paper, and packaging materials.
Investment Incentives
- 100% Corporate Income Tax (CIT) exemption for the first 2 years
- 50% CIT reduction for the following 4 years
Construction density: 70%
Maximum building height: 3 floors
Land use coefficient: 2.1 times
Land Lease Prices and Fees
- Infrastructure lease price: 120 USD/m² (excluding VAT)
- Management & infrastructure maintenance fee: 0.5 USD/m²/year (excluding VAT)
- Wastewater treatment price: As per the provider's rate
- Clean water price: As per the provider's rate
- Electricity price: As per EVN’s rate
Contact
For land leasing and factory setup in Thuy Nguyen Industrial Park – Phase I, Hai Phong City, please contact the Sales Department via:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.9234, 106.7267
Videos of this park
This park has no videos yet