KCNNinh Binh
THANH BINH II INDUSTRIAL PARK – NINH BINH
.png)
1 photos
Key facts
- Total area
- 226.6 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
THANH BINH II INDUSTRIAL PARK – NINH BINH
Address: Thanh Nguyen Commune, Thanh Hai Commune, Thanh Liem District, Ninh Binh Province
Operational Period: 2024 - 2074
Total Area: 226.6 ha
Land Rental Price: 115 - 120 USD/m²
Strategic Location and Regional Connectivity
- Approximately 65 km from Hanoi city center
- About 86 km from Noi Bai International Airport
- Around 14 km from Phu Ly City
- About 100 km from Hai Phong Port
Infrastructure of Thanh Binh II Industrial Park
Power Supply System
- Total electricity demand: approximately 75.1 MVA
- Power source: Supplied from the 110kV/35(22)kV Thanh Binh station located on the western side of the industrial park
Water Supply System
- Total water demand: approximately 12,000 m³/day-night
Wastewater Treatment System
- Total wastewater demand: approximately 8,300 m³/day-night
Fire Protection System
- Water sourced from supply pipes along the main roads, drainage ditches inside and around the industrial park
- Fire hydrants are installed with a maximum distance of 150 meters between them
- A specialized fire prevention and fighting team is stationed at the technical infrastructure area of the industrial park
Telecommunication System
- Fixed broadband Internet demand: approximately 4,150 subscriptions (excluding mobile phone and 4G mobile broadband subscriptions)
Investment Sectors Attracted to Thanh Binh II Industrial Park
- Electronics - Mechanical engineering
- Textiles and garments
- Processing industries
- Building materials
- Other supporting industries
Investment Incentives at Thanh Binh II Industrial Park
- Corporate income tax exemption for the first 2 years and a 50% reduction in payable tax for the next 4 years
Land Rental Prices and Fees at Thanh Binh II Industrial Park
- Infrastructure Rental Price: 115 - 120 USD/m² (excluding VAT)
- Management and Maintenance Fees: Updating
- Wastewater Treatment Fee: Based on supplier’s pricing
- Clean Water Fee: Based on supplier’s pricing
- Electricity Price: Based on EVN’s pricing
- Telecommunication Fees: Based on the provider’s pricing at the time of installation
Contact Information
Partners interested in leasing land for setting up manufacturing facilities at Thanh Binh II Industrial Park, Ninh Binh Province, please contact:
- Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.4079, 105.9336
Videos of this park
This park has no videos yet