TAY BAC CU CHI INDUSTRIAL PARK – HO CHI MINH

1 photos
Key facts
- Total area
- 381 ha
- Rent
- 250*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TAY BAC CU CHI INDUSTRIAL PARK – HO CHI MINH
Address: Tan An Hoi Commune, Ho Chi Minh City
Operation Period: 1997 – 2047
Total Area: 381 ha
Land Lease Price: 250 USD/m² (VAT excluded)
Strategic Location and Regional Connectivity
- About 35 km from Ho Chi Minh City center;
- About 29 km from Tan Son Nhat International Airport;
- About 35 km from Saigon Railway Station;
- About 40 km from Saigon Port;
- About 57 km from Cat Lai Port.
Infrastructure of Tay Bac Cu Chi Industrial Park
Power Supply System
Large capacity source 2×40 MVA, voltage 110/35/22, ensuring high and stable performance for smooth operation and living activities.
Water Supply System
Sourced from 8 existing groundwater wells with a capacity of 3,200 m³/day-night. Two additional wells and a water plant with a capacity of 6,000 m³/day-night (sourced from Dong Canal surface water) will be constructed in the near future.
Wastewater Treatment System
Current capacity: 5,000 m³/day-night. In the expansion phase, a centralized solid waste collection area of about 1,000 m² will be established in the Northwest area, with waste sorted and treated according to regulations.
Telecommunication System
International-standard telecommunications system, ready to meet high-speed communication and data requirements.
Investment-attracting Industries at Tay Bac Cu Chi Industrial Park
- Mechanical industry;
- Electrical – electronics – telecommunications;
- Chemicals, pharmaceuticals, cosmetics;
- Consumer goods;
- Footwear;
- Handicraft and furniture;
- Food processing.
Investment Incentives at Tay Bac Cu Chi Industrial Park
Corporate income tax exemption for the first 2 years and 50% reduction for the following 4 years.
Construction Density: 70%
Maximum Height: 3 floors
Land Use Coefficient: 2.1 times
Land Lease Price and Other Costs
- Infrastructure rental: 250 USD/m² (VAT excluded)
- Management fee: 0.6 USD/m²/year (VAT excluded)
- Water price: 0.5 USD/m³
- Wastewater treatment fee: 0.35 USD/m³
- Electricity price: As regulated by the supplier
- Telecommunication fee: As regulated by the supplier
Contact
For land lease and factory setup at Tay Bac Cu Chi Industrial Park, Ho Chi Minh City, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
10.9831, 106.4840
Videos of this park
This park has no videos yet