TAN THOI HIEP INDUSTRIAL PARK – HO CHI MINH

1 photos
Key facts
- Total area
- 215.4 ha
- Rent
- 250*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TAN THOI HIEP INDUSTRIAL PARK – HO CHI MINH
Address: Tan Thoi Hiep Ward, Ho Chi Minh City
Operation period: 1999 – 2049
Total area: 215.4 ha
Land rental price: 250 USD/m² (excluding VAT)
Strategic location and regional connectivity
- About 15 km from Ho Chi Minh City center;
- About 16 km from Saigon Railway Station;
- About 6 km from Tan Son Nhat International Airport;
- About 18 km from Saigon Port.
Infrastructure of Tan Thoi Hiep Industrial Park
Power supply system
Electricity supplied from the national grid with a capacity of 65KVA - 43.8MW, ensuring continuous and efficient supply for all production and business activities.
Water supply system
Clean water is treated to domestic standards before distribution to enterprises, with a capacity of up to 3,000 m³/day.
Wastewater treatment system
Equipped with modern facilities, with a capacity of 10,500 m³/day, ensuring all wastewater is treated to standards before discharge into the environment.
Telecommunication system
Telecommunication infrastructure built to international standards, providing full services from basic communication to high-speed data transmission. Fully meets the needs of enterprises, from internet and voice to advanced communication services.
Investment-attracting industries at Tan Thoi Hiep Industrial Park
- Mechanical engineering and electrical machinery;
- Electronics, information technology, and telecommunications;
- Light industry;
- Furniture and plastic materials production;
- Vehicle manufacturing and spare parts;
- Food processing and production industry;
- Steel and construction materials industry;
- Environmentally friendly industries.
Investment incentives at Tan Thoi Hiep Industrial Park
- Exemption from corporate income tax for the first 2 years, and a 50% reduction in payable tax for the next 4 years.
- Construction density: 70%
- Maximum building height: 3 floors
- Land use coefficient: 2.1 times
Land rental and other costs at Tan Thoi Hiep Industrial Park
- Infrastructure rental: 250 USD/m² (excluding VAT)
- Management fee: 0.6 USD/m²/year (excluding VAT)
- Water price: 0.5 USD/m³
- Wastewater treatment fee: 0.35 USD/m³
- Electricity price: According to supplier’s regulations
- Telecommunication charges: According to supplier’s regulations
Contact
Partners interested in leasing land for factory construction at Tan Thoi Hiep Industrial Park, Ho Chi Minh City, please contact Hotline: 1900.888.858 or Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
10.8839, 106.6330
Videos of this park
This park has no videos yet