Key facts
- Total area
- 51.8 ha
- Rent
- 120*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TAN HOI INDUSTRIAL CLUSTER – TAY NINH
Address: Tan Hoi Commune, Tay Ninh Province
Operation period: 2010 – 2060
Total area: 51.8 hectares
Land lease price: 120 USD/m² (excluding VAT)
Strategic location and regional connectivity
- About 7 km from Ka Tum Border Gate;
- About 150 km from Ho Chi Minh City;
- About 150 km from Tan Son Nhat Airport;
- About 144 km from Cat Lai Port;
- About 75 km from Moc Bai International Border Gate.
Infrastructure of Tan Hoi Industrial Cluster
Power supply system
Electricity for Tan Hoi Industrial Cluster is supplied from the existing 22kV power grid running along Provincial Road 785. To meet future electricity demand, the cluster plans to invest in an independent 22kV medium-voltage line.
Water supply system
The investor has completed the construction of a clean water supply system with a treatment plant of 3,000 m³/day-night capacity.
Wastewater treatment system
A centralized wastewater treatment plant with a capacity of 2,000 m³/day-night has been completed and put into operation since May 2016.
Telecommunication system
Services are provided by VNPT and Viettel.
Fire prevention and fighting system
Lighting and fire prevention systems have been fully installed and are operational.
Investment-attracted industries
- Food processing industry;
- Pharmaceuticals and medical equipment;
- Electronics and telecommunications industry;
- Mechanical engineering;
- Stationery production;
- Sports equipment;
- Interior decoration products.
Investment incentives
According to the provisions of Vietnamese law.
Construction density: 70%
Maximum number of floors: 3 floors
Land use coefficient: 2.1 times
Land lease rates and other fees
Infrastructure lease price: 120 USD/m² (excluding VAT)
Management fee: 0.5 USD/m²/year (excluding VAT)
Wastewater treatment fee: 0.4 USD/m³
Water price: 0.4 USD/m³
Electricity price: According to EVN regulations
Contact
For partners wishing to lease land for factory development at Tan Hoi Industrial Cluster, Tay Ninh Province, please contact:
Hotline: 1900.888.858 | Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
11.6467, 106.1862
Videos of this park
This park has no videos yet