CCNThai Nguyen

TAN DUC INDUSTRIAL CLUSTER – THAI NGUYEN

1 photos

Key facts

Total area
64.3 ha
Rent
Not updated
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

Overview

TAN DUC INDUSTRIAL CLUSTER – THAI NGUYEN
Address: Tan Duc Commune, Phu Binh District, Thai Nguyen Province
Operational period: 2024 – 2074
Total area: 64.30 ha
Land rental price: 100 - 110 USD/m² (excluding VAT)

Strategic location and regional connectivity

  • Approximately 81 km from Hanoi city center
  • Approximately 30 km from Thai Nguyen city center
  • Approximately 63 km from Noi Bai International Airport
  • Approximately 134 km from Hai Phong Port

Infrastructure of Tan Duc Industrial Cluster

Power supply system
110kV substation with a capacity of 3x63 MVA

Water supply system
Water supply capacity of about 2,430 m³/day

Wastewater treatment system
Wastewater treatment plant capacity: 1,850 m³/day

Transportation system
Main roads: 25m wide
Secondary roads: 17.5m – 20.5m wide

Firefighting system
Fully equipped with fire hydrants

Telecommunication and internet system
Major providers such as Viettel, FPT, VNPT

Targeted investment industries

  • Automobile industry, production of general and specialized machinery; other metal manufacturing and metal processing services
  • Paper and paper products industry; production of goods from wood, bamboo, rattan, straw, and knitted materials
  • Food processing industry; pharmaceuticals and therapeutic products; garment manufacturing; beverages; leather and rubber production
  • Electrical and electronic equipment manufacturing
  • Handicraft production
  • Warehousing, storage, and logistics support services

Investment incentives at Tan Duc Industrial Cluster

Tax rate of 17% for 10 years 

Corporate income tax exemption for the first 2 years and a 50% reduction for the next 4 years

Land rental prices and costs at Tan Duc Industrial Cluster

  • Infrastructure rental price: 100 - 110 USD/m² (excluding VAT)
  • Wastewater treatment fee: 0.55 USD/m³
  • Clean water price: 0.5 USD/m³
  • Telecommunication charges: Based on provider’s rates at installation time
  • Electricity price:
    • Normal hours: 0.065 USD/kWh
    • Off-peak hours: 0.042 USD/kWh
    • Peak hours: 0.12 USD/kWh
  • Infrastructure management and maintenance fee: 0.6 USD/m²/year (excluding VAT)

Contact

For partners interested in leasing land to set up a manufacturing plant at Tan Duc Industrial Cluster, Thai Nguyen Province, please contact:
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.4432, 106.0230

Videos of this park

Empty

This park has no videos yet

?