CCNThai Nguyen
TAN DUC INDUSTRIAL CLUSTER – THAI NGUYEN

1 photos
Key facts
- Total area
- 64.3 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
TAN DUC INDUSTRIAL CLUSTER – THAI NGUYEN
Address: Tan Duc Commune, Phu Binh District, Thai Nguyen Province
Operational period: 2024 – 2074
Total area: 64.30 ha
Land rental price: 100 - 110 USD/m² (excluding VAT)
Strategic location and regional connectivity
- Approximately 81 km from Hanoi city center
- Approximately 30 km from Thai Nguyen city center
- Approximately 63 km from Noi Bai International Airport
- Approximately 134 km from Hai Phong Port
Infrastructure of Tan Duc Industrial Cluster
Power supply system
110kV substation with a capacity of 3x63 MVA
Water supply system
Water supply capacity of about 2,430 m³/day
Wastewater treatment system
Wastewater treatment plant capacity: 1,850 m³/day
Transportation system
Main roads: 25m wide
Secondary roads: 17.5m – 20.5m wide
Firefighting system
Fully equipped with fire hydrants
Telecommunication and internet system
Major providers such as Viettel, FPT, VNPT
Targeted investment industries
- Automobile industry, production of general and specialized machinery; other metal manufacturing and metal processing services
- Paper and paper products industry; production of goods from wood, bamboo, rattan, straw, and knitted materials
- Food processing industry; pharmaceuticals and therapeutic products; garment manufacturing; beverages; leather and rubber production
- Electrical and electronic equipment manufacturing
- Handicraft production
- Warehousing, storage, and logistics support services
Investment incentives at Tan Duc Industrial Cluster
Tax rate of 17% for 10 years
Corporate income tax exemption for the first 2 years and a 50% reduction for the next 4 years
Land rental prices and costs at Tan Duc Industrial Cluster
- Infrastructure rental price: 100 - 110 USD/m² (excluding VAT)
- Wastewater treatment fee: 0.55 USD/m³
- Clean water price: 0.5 USD/m³
- Telecommunication charges: Based on provider’s rates at installation time
- Electricity price:
- Normal hours: 0.065 USD/kWh
- Off-peak hours: 0.042 USD/kWh
- Peak hours: 0.12 USD/kWh
- Infrastructure management and maintenance fee: 0.6 USD/m²/year (excluding VAT)
Contact
For partners interested in leasing land to set up a manufacturing plant at Tan Duc Industrial Cluster, Thai Nguyen Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.4432, 106.0230
Videos of this park
This park has no videos yet