KCNDong Nai

TAM PHUOC INDUSTRIAL PARK – DONG NAI

1 photos

Key facts

Total area
323.18 ha
Rent
160*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

TAM PHUOC INDUSTRIAL PARK – DONG NAI
Address: Tam Phuoc Ward, Dong Nai Province
Operation period: 2003 – 2053
Total area: 323.18 ha
Land lease price: 160 USD/m² (VAT excluded)

Strategic location and regional connectivity

  • About 35 km from Ho Chi Minh City center;
  • About 50 km from Tan Son Nhat International Airport;
  • About 10 km from Long Thanh International Airport;
  • About 25 km from Thi Vai Port;
  • About 40 km from Saigon New Port.

Infrastructure of Tam Phuoc Industrial Park

Power supply system
The 22KV medium-voltage power line along National Highway 51 directly supplies Tam Phuoc, with a source capacity of about 63 MVA.

Water supply system
A large-scale water supply facility with a capacity of up to 300,000 m³/day-night.

Wastewater treatment system
Tam Phuoc Industrial Park has invested in a centralized wastewater treatment plant with a capacity of 7,000 m³/day-night. It treats all domestic and industrial wastewater to meet the national technical standard QCVN 40:2011/BTNMT.

Telecommunication system
A complete technical corridor supports rapid installation of multiple telecommunication services such as ADSL, Fiber, and Telephone lines.

Investment-attractive industries in Tam Phuoc Industrial Park

  • Export wood processing;
  • Garment production;
  • Paint, varnish, coating, and putty production;
  • Agricultural, forestry, and fishery product processing;
  • Mechanical manufacturing and assembly;
  • Construction materials production (ceramic tiles, cement);
  • Packaging production (metal or paper);
  • Transportation and logistics;
  • Electronics manufacturing, distribution, and assembly.

Investment incentives in Tam Phuoc Industrial Park

  • Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.
  • Construction density: 70%
  • Maximum building height: 3 floors
  • Land use coefficient: 2.1 times

Land lease and other costs in Tam Phuoc Industrial Park

  • Infrastructure rental: 160 USD/m² (VAT excluded)
  • Management fee: 0.5 USD/m²/year (VAT excluded)
  • Wastewater treatment fee: 0.4 USD/m³
  • Water supply fee: 0.4 USD/m³
  • Electricity price: According to EVN’s regulations

Contact

For partners seeking to lease land and set up manufacturing plants in Tam Phuoc Industrial Park, Dong Nai Province, please contact Hotline: 1900.888.858 or Email: [email protected].

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

10.8665, 106.9371

Videos of this park

Empty

This park has no videos yet

?