KCNDong Nai
TAM PHUOC INDUSTRIAL PARK – DONG NAI

1 photos
Key facts
- Total area
- 323.18 ha
- Rent
- 160*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TAM PHUOC INDUSTRIAL PARK – DONG NAI
Address: Tam Phuoc Ward, Dong Nai Province
Operation period: 2003 – 2053
Total area: 323.18 ha
Land lease price: 160 USD/m² (VAT excluded)
Strategic location and regional connectivity
- About 35 km from Ho Chi Minh City center;
- About 50 km from Tan Son Nhat International Airport;
- About 10 km from Long Thanh International Airport;
- About 25 km from Thi Vai Port;
- About 40 km from Saigon New Port.
Infrastructure of Tam Phuoc Industrial Park
Power supply system
The 22KV medium-voltage power line along National Highway 51 directly supplies Tam Phuoc, with a source capacity of about 63 MVA.
Water supply system
A large-scale water supply facility with a capacity of up to 300,000 m³/day-night.
Wastewater treatment system
Tam Phuoc Industrial Park has invested in a centralized wastewater treatment plant with a capacity of 7,000 m³/day-night. It treats all domestic and industrial wastewater to meet the national technical standard QCVN 40:2011/BTNMT.
Telecommunication system
A complete technical corridor supports rapid installation of multiple telecommunication services such as ADSL, Fiber, and Telephone lines.
Investment-attractive industries in Tam Phuoc Industrial Park
- Export wood processing;
- Garment production;
- Paint, varnish, coating, and putty production;
- Agricultural, forestry, and fishery product processing;
- Mechanical manufacturing and assembly;
- Construction materials production (ceramic tiles, cement);
- Packaging production (metal or paper);
- Transportation and logistics;
- Electronics manufacturing, distribution, and assembly.
Investment incentives in Tam Phuoc Industrial Park
- Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.
- Construction density: 70%
- Maximum building height: 3 floors
- Land use coefficient: 2.1 times
Land lease and other costs in Tam Phuoc Industrial Park
- Infrastructure rental: 160 USD/m² (VAT excluded)
- Management fee: 0.5 USD/m²/year (VAT excluded)
- Wastewater treatment fee: 0.4 USD/m³
- Water supply fee: 0.4 USD/m³
- Electricity price: According to EVN’s regulations
Contact
For partners seeking to lease land and set up manufacturing plants in Tam Phuoc Industrial Park, Dong Nai Province, please contact Hotline: 1900.888.858 or Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
10.8665, 106.9371
Videos of this park
This park has no videos yet