TAM MY TAY INDUSTRIAL CLUSTER – PHASE 2 – DA NANG

1 photos
Key facts
- Total area
- 29.8 ha
- Rent
- 70*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TAM MY TAY INDUSTRIAL CLUSTER – PHASE 2 – DA NANG
Address: Tam My Commune, Da Nang City
Operation period: 50 years from the date of land lease approval
Total area: 29.8 ha
Land rental price: 70 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 106 km from Da Nang city center;
- About 105 km from Da Nang International Airport;
- About 115 km from Tien Sa Port.
Infrastructure of Tam My Tay Industrial Cluster – Phase 2
Power Supply System
Electricity is supplied from the regional substation via 22kV transmission lines.
Water Supply System
Total water supply capacity for the entire industrial cluster is approximately 1,500 m³/day and night.
Wastewater Treatment System
Centralized wastewater treatment plant with a capacity of 500 m³/day and night.
Telecommunication System
Infrastructure supports wide-area 5G coverage, meeting maximum demand for digital transformation and smart factory operations.
Investment Attraction Sectors
- Garment manufacturing;
- Footwear production;
- Paper and packaging;
- Plastic products;
- Non-alcoholic beverage production;
- Printing.
Investment Incentives
In accordance with current legal regulations.
Construction density: 60%
Maximum building height: 3 floors
Land use coefficient: 1.8 times
Land Rental Price and Fees
Infrastructure rental price: 70 USD/m² (excluding VAT)
Management fee: 0.5 USD/m²/year (excluding VAT)
Electricity price: According to EVN regulations
Water price: According to supplier’s regulations
Wastewater treatment fee: According to supplier’s regulations
Telecommunication fee: According to supplier’s regulations at installation time
Contact
For partners wishing to lease land and build production factories at Tam My Tay Industrial Cluster – Phase 2, Da Nang City, please contact:
Hotline: 1900.888.858