KCNAn Giang
TAC CAU INDUSTRIAL PARK - AN GIANG

1 photos
Key facts
- Total area
- 68 ha
- Rent
- 60*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
TAC CAU INDUSTRIAL PARK - AN GIANG
Address: Binh An Commune, An Giang Province
Operating period: 2023 - 2073
Total area: 68 ha
Land rental price: 60 USD/m² (excluding VAT)
Strategic location and regional connectivity
- About 17 km from Rach Gia City center
- About 5 km from Chau Thanh District center
- About 10 km from Rach Gia Airport
Infrastructure of Tac Cau Industrial Park
Power supply system
Power is supplied from two medium-voltage grids: 35kV Minh Luong – An Bien and 22kV line from Minh Luong to Tac Cau.
Water supply system
Tac Cau Water Plant with a capacity of 4,000 m³/day-night.
Wastewater treatment system
Wastewater treatment station with a capacity of about 2,000 m³/day-night.
Telecommunication system
VNPT telecommunication services are installed based on international standards, ensuring efficient domestic and international communication.
Investment-attracting industries in Tac Cau Industrial Park
- Agricultural and aquatic product processing
- Mechanical industry
- Food production
- Packaging, plastic products, ice production, storage, and warehousing
Investment incentives in Tac Cau Industrial Park
Corporate income tax exemption for the first 4 years and 50% tax reduction for the following 9 years.
Construction density: 60%
Maximum building height: 3 floors
Land use coefficient: 1.8 times
Land rental price and related costs in Tac Cau Industrial Park
- Infrastructure rental: 60 USD/m² (excluding VAT)
- Management and maintenance fee: 0.5 USD/m²/year (excluding VAT)
- Wastewater treatment fee: 0.4 USD/m³
- Water price: 0.4 USD/m³
- Electricity price: According to the supplier’s rates
Contact
For land lease and factory construction in Tac Cau Industrial Park, An Giang Province, please contact Hotline: 1900.888.858 or Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
9.8789, 105.1253
Videos of this park
This park has no videos yet