SONG CONG II INDUSTRIAL PARK PHASE 2 - THAI NGUYEN

1 photos

Key facts

Total area
296 ha
Rent
Not updated
Occupancy
Not updated
Year established
2024
Investor
Not updated
Management unit
Not updated

Overview

SONG CONG II INDUSTRIAL PARK PHASE 2 - THAI NGUYEN

​Address: Song Cong City, Thai Nguyen Province

​Operating time: 2024 - 2074

​Total area: 296 ha

​Land rental price: 110 - 120 USD/m²/rental cycle

Strategic location and regional connectivity

​Song Cong II Industrial Park Phase 2 is located adjacent to the new National Highway 3, near the Hanoi - Thai Nguyen Expressway, offering convenient transportation and logistics advantages:

l About 3km from the Hanoi - Thai Nguyen Expressway;

l About 160km from Hai Phong Seaport;

l About 44km from Noi Bai International Airport;

l About 12km from Thai Nguyen City;

l About 5km from the center of Song Cong City;

l About 55km from Hanoi;

l About 190km from Cai Lan Port, Quang Ninh.

 

Location map of Song Cong II Industrial Park Phase 2

Investment-attracting industries in Song Cong II Industrial Park Phase 2

l Electronics industry;

l Telecommunications;

l Pharmaceutical and cosmetic production;

l Supporting industries;

l New material production;

l Clean energy, renewable energy, and smart energy industries;

l Processing and manufacturing industries;

l Other industries suitable with local planning.

Infrastructure at Song Cong II Industrial Park Phase 2

Power supply system

New 110KV Song Cong 3 substation with a capacity of 3x63MVA and 110KV Song Cong 4 substation with a capacity of 3x63MVA will provide electricity to the industrial park.

Water supply system

l Water supply sourced from Song Cong Water Plant and Tich Luong Water Plant, with a capacity of 7,200 m³/day-night.

l A new water treatment station with a capacity of 4,800 m³/day-night will be built.

Fire prevention and fighting system

l The firefighting water system is arranged along the roads.

l Fire hydrants are placed 120m - 150m apart along the roads.

Wastewater treatment system

A wastewater treatment plant with a capacity of 11,200 m³/day-night will be constructed.

Traffic system

l External traffic: Ring Road 5 of Hanoi Capital Region with a planned width of 74.5m and 6 lanes; Hanoi - Thai Nguyen Expressway with a width of 34m; DT262 provincial road with a width of 42m.

l Internal traffic: The main road is 36m wide, and branch roads range from 22.5m to 28.5m wide.

 2.jpg

Perspective of a part of Song Cong II Industrial Park Phase 2

Investment incentives at Song Cong II Industrial Park Phase 2

Exemption from corporate income tax for the first 2 years and a 50% reduction in the following 4 years.

Investment process at Song Cong II Industrial Park Phase 2

1. Sign the agreement and principal land lease contract

2. Register for the Investment Registration Certificate

3. Register for the Enterprise Registration Certificate, tax code, and company seal

4. Sign the official land lease contract and hand over the land

5. Agree on the connection point

6. Submit for appraisal of the detailed design after the basic design

7. Submit for fire prevention and firefighting approval

8. Submit for environmental impact assessment report approval

9. Submit the application for a construction permit

10. Construct factories and install machinery and equipment

11. Register for the land use rights certificate

Land rental price and other costs at Song Cong II Industrial Park Phase 2

Infrastructure rental price: 110 - 120 USD/m²/rental cycle

Management fee: 0.7 USD/m²/year

Wastewater treatment fee: 0.6 USD/m³

Water price: 0.5 USD/m³

Electricity price: According to EVN rates

Telecommunication charges: According to the provider's rates at the time of installation

The above prices and fees do not include VAT and are subject to change. Please contact IIP for the latest updates.

Contact:

​Partners interested in renting land to open factories in Song Cong II Industrial Park Phase 2, please contact Hotline: 1900.888.858 or Email: [email protected].

 