CCNThai Nguyen

SON CAM INDUSTRIAL CLUSTER – THAI NGUYEN

1 photos

Key facts

Total area
70.58 ha
Rent
Not updated
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

Overview

SON CAM INDUSTRIAL CLUSTER – THAI NGUYEN

Operation Period: 2020 - 2070
Address: Son Cam Commune, Thai Nguyen City, Thai Nguyen Province
Total Area: 70.58 ha
Land Rental Price: 95 - 102 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • Distance to Thai Nguyen City Center: 5 km
  • Distance to Thai Nguyen - Hanoi Expressway: 1 km
  • Central hub for regional transportation networks:
    • National Highway 3: Connects to Bac Kan, Cao Bang, and the Vietnam-China border gate.
    • National Highway 1B: Connects to Lang Son.
    • National Highway 37: Connects to Bac Ninh and Bac Giang.
    • Railway: Thai Nguyen – Hanoi – Lang Son railway.
  • Air Transport: 69 km from Noi Bai International Airport (approximately 40 minutes by car).
  • Rail Transport: 5 km from Quan Trieu railway station (Hanoi – Thai Nguyen – Lang Son railway route).

Son Cam Industrial Cluster Infrastructure

Power Supply System

  • The entire power system is supplied directly to factory premises.
  • The power infrastructure is comprehensively developed, designed to meet standards, and approved by relevant authorities.
  • Tenants sign power contracts directly with Thai Nguyen Power Company.

Water Supply System

  • Clean water supply plant owned by the investor.
  • Pipelines are constructed to provide direct clean water supply to factories in Son Cam Industrial Cluster.

Transportation System

Developed with modern and synchronized infrastructure:

  • Main road: 30m right-of-way, including:
    • Roadway: 2 lanes of 7.5m each.
    • Sidewalks: 2 x 6m.
    • Median strip: 3m.
  • Internal roads: 5 routes with varying widths and lengths:
    • 3 roads: 16.5m wide, approximately 2,887m long.
    • 1 road: 16.5m wide, approximately 495m long.
    • 1 auxiliary road: 10m wide, approximately 283m long, also serving as a repaved local access road.

Telecommunications System

  • Built with modern cabling and equipment meeting international standards to ensure high-speed connectivity.
  • Underground cable system is directly connected to factories.

Fire Protection System

Designed in compliance with standard regulations.

Industries Encouraged for Investment at Son Cam Industrial Cluster

  • Textile supply chain industries (packaging production, textile manufacturing, fiber production, dyeing, washing, etc.).
  • Supporting industries (mechanical engineering, casting, electronic components, etc.).
  • Mineral processing.
  • Building materials production (As per Decision No. 184/QD-UBND of Thai Nguyen Province dated January 17, 2020).

Investment Incentives at Son Cam Industrial Cluster

  • Corporate income tax exemption for the first 2 years from taxable income generation and a 50% reduction for the next 4 years.

Land Rental Rates and Costs at Son Cam Industrial Cluster

Infrastructure rental price: 95 - 102 USD/m² (excluding VAT).
Wastewater and waste treatment fees:

  • Wastewater treatment: 0.5 USD/m³ (excluding VAT).
  • Solid waste disposal: As per government pricing regulations.
    Clean water price: 0.6 USD/m³ (excluding VAT).
    Telecommunication fees: Based on the provider’s rates at the time of installation.
    Electricity price: Tenants sign direct contracts with Thai Nguyen Power Company, based on provincial electricity pricing regulations.
    Management and infrastructure maintenance fee: 0.5 USD/m²/year (excluding VAT).

Contact Information

For land lease and factory setup inquiries at Son Cam Industrial Cluster, Thai Nguyen Province, please contact:
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.6288, 105.8009

Videos of this park

Empty

This park has no videos yet

?