KCNPhu Tho
SHI IP TAM DUONG INDUSTRIAL PARK - PHU THO
Key facts
- Total area
- 163 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
SHI IP TAM DUONG INDUSTRIAL PARK - PHU THO
Location: Tam Duong Commune, Phu Tho Province.
Operating Term: 2023 – 2060
Total Area: 162.33 ha
Land Lease Price: 120 – 140 USD/m² (Reference price, excl. VAT)
Geographic Coordinates: 21.3789° N, 105.5412° E
1. Strategic Location & Connectivity
To IC4 Interchange (Noi Bai - Lao Cai Expressway): ~3km
To Noi Bai International Airport: ~28km
To Hanoi City Center: ~50km
To Hai Phong Port: ~160km
Regional Connectivity: Located on the Kunming - Lao Cai - Hanoi - Hai Phong - Quang Ninh economic corridor.
2. Infrastructure
Power: Internal 110/22kV substation ensuring stable and continuous supply for all factories.
Water: Internal clean water plant meeting standards with a capacity of ~6,000 m³/day.
Wastewater Treatment: Centralized treatment plant with a capacity of 4,500 m³/day, adhering to strict environmental standards.
Telecom: High-speed fiber optic infrastructure and Smart Industrial Park (Smart IP) management system.
3. Investment Sectors
Manufacturing and processing industries.
Food and beverage production.
New technology construction materials.
Logistics and supporting industries.
4. Incentives & Costs
Incentives: Standard Corporate Income Tax incentives for industrial parks as per current law. Rapid support for investment procedures and construction permits from Son Ha Group and local authorities.
Construction Criteria: Density: 60%; Max height: 5 floors; Plot ratio: 3.0.
Management Fee: 0.5 USD/m²/year.
Labor (Zone II): Min wage: 4,410,000 VND; Average salary: 7,500,000 – 9,500,000 VND.
Contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.3789, 105.5412
Videos of this park
This park has no videos yet