KCNBac Ninh
QUE VO II INDUSTRIAL PARK – PHASE 2 – BAC NINH

1 photos
Key facts
- Total area
- 277 ha
- Rent
- 160*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
QUE VO II INDUSTRIAL PARK – PHASE 2 – BAC NINH
Address: Phu Lang Commune, Bac Ninh Province
Operation period: 2021–2071
Total area: 277 ha
Land rental price: 160 USD/m² (excluding VAT)
Strategic location and regional connectivity
Approximately 60 km from Noi Bai International Airport
Approximately 72 km from Hai Phong Port
Approximately 46 km from the Hanoi–Hai Phong Expressway
Approximately 129 km from Lang Son Border Gate
Infrastructure of Que Vo II Industrial Park – Phase 2
Power supply system
Electricity is supplied from the 110/35/22kV Que Vo 5 substation with a capacity of 2×63 MVA. The 22kV branches are connected directly to each land lot within the industrial park.
Water supply system
The clean water supply system has a capacity of 7,000 m³/day and is pre-connected with pipelines reaching each land lot.
Wastewater treatment system
The centralized wastewater treatment system has a capacity of 7,000 m³/day, capable of treating wastewater to Vietnamese environmental Standard A.
Fire prevention and fighting system
Fire hydrants are arranged along internal roads at intervals of 120–150 meters.
Telecommunications system
All communication lines are routed through an underground technical duct system. 4G and 5G base stations are installed to ensure full coverage across the industrial park.
Investment-attracting sectors
Electronics and telecommunications industry
Pharmaceuticals
Supporting technologies and new materials
Clean energy, renewable energy, smart energy
Processing and manufacturing industry
Investment incentives
Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.
Land rental and related fees
Land rental with completed infrastructure: 160 USD/m² (excluding VAT)
Management fee: 0.5 USD/m²/year (excluding VAT)
Water tariff: 0.4 USD/m³
Electricity tariff: According to provider regulations
Wastewater treatment fee: 0.4 USD/m³
Contact
For land leasing and factory development at Que Vo II Industrial Park – Phase 2, Bac Ninh Province, please contact Hotline: 1900.888.858 or Email: [email protected]