KCNBac Ninh

QUANG CHAU 2 INDUSTRIAL PARK – BAC NINH

1 photos

Key facts

Total area
123.49 ha
Rent
140*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

QUANG CHAU 2 INDUSTRIAL PARK – BAC NINH 

​Address: Nenh Ward, Bac Ninh Province

Operation period: 2025 – 2075
Total area: 123.49 ha
Land lease price: 140 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 44 km from Hanoi city center;
  • About 45 km from Noi Bai International Airport;
  • About 140 km from Hai Phong Port.

Infrastructure of Quang Chau 2 Industrial Park

Traffic system
The internal roads in the industrial park have a cross-section width of 27 m; branch roads range from 22.5 to 27 m in width.

Power supply system
Power source: Initially, the power supply for the project will be taken from the 22 kV line 472-E7.18 (22 kV line after Quang Chau 1 110 kV substation), with AC-120mm² conductor.
In addition, the power sector is currently investing in the construction of a new 110 kV Quang Chau 2 substation, which will provide power for the industrial park.

Water supply system
The water supply for the area is taken from the DNP Bac Giang clean water plant.
The connection point uses a D200 pipe reserved for linkage.
The water distribution network is designed as a closed-loop system combined with branch lines running along main roads.

Wastewater treatment system
A separate wastewater treatment station is built in the industrial park, with capacity and standards meeting QCVN 40:2025/BTNMT – National Technical Regulation on Industrial Wastewater, Column A, before discharge into the external drainage canal.

Firefighting system
The firefighting water network is designed together with the domestic water supply system, operating under low pressure.
The required free pressure at the fire hydrant outlet is not less than 10 meters.

Investment Sectors Attracted

  • Agricultural and forestry product processing;
  • Food processing;
  • Mechanical engineering and machinery manufacturing;
  • Electronic component manufacturing;
  • Packaging industry;
  • Supporting industries applying modern, advanced, and environmentally friendly technologies.

Investment Incentives

Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.

Construction density: 70%
Maximum building height: 5 floors
Land use coefficient: 3.5 times

Land Lease and Other Fees

  • Infrastructure rental: 140 USD/m² (excluding VAT)
  • Management fee: 0.5 USD/m²/year (excluding VAT)
  • Water price: 0.4 USD/m³
  • Wastewater treatment fee: 0.35 USD/m³
  • Electricity price: According to the supplier’s regulations
  • Telecommunication fee: According to the supplier’s regulations

Contact

For partners wishing to lease land and establish manufacturing facilities in Quang Chau 2 Industrial Park, Bac Ninh Province, please contact:
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.2142, 106.1215

Videos of this park

Empty

This park has no videos yet

?