KCNQuang Tri

QUAN NGANG INDUSTRIAL PARK PHASE 3 - QUANG TRI

1 photos

Key facts

Total area
116 ha
Rent
65*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

QUAN NGANG INDUSTRIAL PARK PHASE 3 - QUANG TRI

Address: Gio Linh Commune, Quang Tri Province 
Operating Period: 2025 – 2075
Total Area: 116 hectares
Land Lease Price: 65 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 15 km from Dong Ha City
  • About 90 km from Phu Bai Airport
  • About 175 km from Da Nang International Airport
  • About 18 km from Cua Viet Port
  • About 110 km from Chan May Port
  • About 180 km from Tien Sa Port
  • About 15 km from Dong Ha Railway Station

Infrastructure of Quan Ngang Industrial Park Phase 3

Power Supply System
Supplied via the 110/22kV Dong Ha transformer station or the national grid through a 22kV medium voltage line.

Water Supply System
Clean water is supplied from the Northern Quang Tri Water Plant with a capacity of approximately 5,000 – 10,000 m³/day.

Wastewater Treatment System
Initial treatment capacity: 3,000 m³/day (can be expanded based on demand). Ensures wastewater meets QCVN Class B standards before discharge.

Telecommunications System
Fully connected with fiber optic internet, telecommunications, and data transmission services provided by major carriers such as VNPT, Viettel, etc.

Targeted Investment Sectors in Quan Ngang Industrial Park Phase 3

  • Agro-forestry product processing industry
  • Light industry
  • Construction materials manufacturing
  • Mechanical engineering, electrical and electronic equipment

Investment Incentives in Quan Ngang Industrial Park Phase 3
In accordance with legal regulations

Land Lease and Related Costs in Quan Ngang Industrial Park Phase 3

  • Infrastructure lease price: 65 USD/m² (excluding VAT)
  • Infrastructure management and maintenance fee: 0.6 USD/m²/year (excluding VAT)
  • Wastewater and solid waste treatment fees: Based on provider’s pricing
  • Telecommunications charges: Based on service provider’s pricing at time of installation
  • Electricity price: Investors sign direct contracts with EVN
  • Clean water price: Based on provider’s pricing

Contact:
For land leasing and factory development at Quan Ngang Industrial Park Phase 3 – Quang Tri, please contact Hotline: 1900.888.858 or Email: [email protected].

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

16.8780, 107.0966

Videos of this park

Empty

This park has no videos yet

?