PHU MY 3 SPECIALIZED INDUSTRIAL PARK – HO CHI MINH

1 photos
Key facts
- Total area
- 1,046 ha
- Rent
- 210*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
PHU MY 3 SPECIALIZED INDUSTRIAL PARK – HO CHI MINH
Address: Tan Phuoc Ward, Ho Chi Minh City
Operation period: 2007 – 2077
Total area: 1,046 ha
Land lease price: 210 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 60 km from Ho Chi Minh City center;
- About 65 km from Tan Son Nhat International Airport;
- About 30 km from Long Thanh International Airport;
- About 2 km from Cai Mep – Thi Vai Port.
Infrastructure of Phu My 3 Specialized Industrial Park
Power Supply System
Stable power is provided by Phu My Thermal Power Plant and Ba Ria Thermal Power Plant operated by Vietnam Electricity (EVN), with a total capacity of 4,100 MW. Electricity of 22kV is supplied to customers’ fences within the industrial park through underground cables.
Water Supply System
Water is supplied to customers’ fences through underground pipelines (D225–D600) with a total capacity of 100,000 m³/day by Phu My Water Supply Joint Stock Company (Wasuco).
Wastewater Treatment System
The centralized wastewater treatment plant of Phu My 3 Specialized Industrial Park, designed and built by Kobelco Eco-Solutions, is the first and most advanced in Ba Ria – Vung Tau province, meeting Column A standards with a treatment capacity of 45,000 m³/day.
Investment Sectors
- Energy industry;
- Mechanical engineering;
- Mineral processing, fertilizer production, petrochemical refining;
- Construction materials manufacturing;
- Machinery, electronics, automobile parts assembly;
- Garment and leather industries, etc.
Investment Incentives
Enterprises in the industrial park enjoy the following corporate income tax incentives:
- 17% on taxable income for the first 10 years from the year revenue is generated;
- Exemption for the first 2 years from the year taxable income arises, and a 50% reduction for the following 4 years.
Construction Parameters
- Building density: 70%
- Maximum height: 3 floors
- Land use coefficient: 2.1 times
Land Lease and Service Fees
- Infrastructure rental: 210 USD/m² (excluding VAT)
- Management fee: 0.6 USD/m²/year (excluding VAT)
- Water price: 0.5 USD/m³
- Wastewater treatment fee: 0.35 USD/m³
- Electricity price: According to supplier regulations
- Telecommunication charges: According to supplier regulations
Contact
For partners seeking to lease land and establish factories in Phu My 3 Specialized Industrial Park – Ho Chi Minh City, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
10.5391, 107.0649
Videos of this park
This park has no videos yet