Key facts

Total area
44.98 ha
Rent
Not updated
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

Overview

NINH BINH INDUSTRIAL CLUSTER - MAI SON
Address: Mai Son Commune, Yen Mo District, Ninh Binh Province
Operation Period: 2015 - 2065
Total Area: 44.98 ha
Land Rental Price: 55 - 65 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 4 km from National Highway 1A;
  • About 9 km from Ninh Binh city center;
  • About 72 km from Hanoi city center;
  • About 95 km from Noi Bai International Airport;
  • About 130 km from Hai Phong Port.

Infrastructure of Ninh Binh Industrial Cluster - Mai Son
Power Supply System
Electricity is supplied via a 35kV grid line from a high-capacity 110kV substation provided by the cluster’s power plant.
Water Supply System
Water system meets both domestic and industrial demands with large capacity, provided by the cluster’s water plant.
Drainage System
Separate drainage systems for rainwater and wastewater.
Wastewater Treatment System
Wastewater from factories and domestic use is treated at a centralized treatment plant with large capacity before discharge into the environment.
Telecommunication System
Equipped with modern international-standard telecom systems, supporting both domestic and international communication.
Internal Transportation System
Includes 2-lane internal roads (21m) and 4-lane main roads (36m), suitable for heavy-duty vehicles.
Firefighting System
Firefighting system is installed alongside the clean water system to ensure safety for the whole cluster.

Investment-Supported Industries in Ninh Binh Industrial Cluster - Mai Son

  • Mechanical services, transportation;
  • Mechanical manufacturing and assembly;
  • High-quality agricultural product processing;
  • Construction materials industry;
  • Clean industries, warehousing, and other non-polluting sectors that complement other industrial zones and clusters in the province.

Investment Incentives
According to legal regulations.

Land and Other Costs in Ninh Binh Industrial Cluster - Mai Son
Infrastructure rental: 55 - 65 USD/m² (excluding VAT)
Management fee: 0.6 USD/m²/year
Wastewater treatment fee: 0.5 USD/m³
Electricity price: According to the provider's rate
Clean water price: 0.5 USD/m³
Telecommunication service fee: As per provider’s rate at installation time

Contact
For land rental and factory establishment in Ninh Binh Industrial Cluster - Mai Son, please contact Hotline: 1900.888.858 or Email: [email protected].

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

20.1880, 105.9636

Videos of this park

Empty

This park has no videos yet

?