CCNBac Ninh

NENH INDUSTRIAL CLUSTER - BAC NINH

1 photos

Key facts

Total area
43 ha
Rent
100*
Occupancy
Not updated
Year established
2022
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

NENH INDUSTRIAL CLUSTER - BAC NINH 

​Address: Viet Yen District, Bac Ninh Province

​Operating Time: 2022 - 2072

​Total Area: 43 ha

​Land Rent Price: 100 USD/m²/lease cycle

 

nh.jpg

Overall Perspective of Nenh Industrial Cluster

Strategic Position and Regional Connectivity

l Approximately 55 km from Hanoi City Center;

l Approximately 45 km from Noi Bai International Airport;

l Approximately 115 km from Huu Nghi International Border Gate;

l Approximately 102 km from Hai Phong Port;

l Adjacent to the Hanoi - Lang Son Expressway running through the southern side;

l Approximately 0.7 km from National Highway 37;

l Approximately 1 km from the Ring Road No. 4;

l Approximately 0.5 km from Provincial Road 295B.

Industries Attracting Investment at Nenh Industrial Cluster

l Electronic components production and assembly;

l Electrical and electronic industries;

l Production of computers and optical products;

l Mechanical industry;

l Production and processing of rubber and plastic products;

l Garment industry;

l Production of medical equipment and instruments;

l Pharmaceutical production;

l Agricultural product processing industry;

l Food production and processing;

l Warehouse and factory leasing;

l Other supporting and manufacturing industries.

Infrastructure at Nenh Industrial Cluster

​Electricity Supply System

The electricity supply for the cluster is provided from the 22kV/35kV power line of the Van Trung 110kV substation.

Water Supply System

l Water supply standard for residential use: 120 liters/person/day.

l Water supply standard for industrial use: 45 m³/ha/day.

Wastewater Treatment System

The central wastewater treatment plant has a capacity of 2,000 m³/day.

Traffic System

The main road has a width of 29m, and branch roads are between 20m and 25m wide.

Investment Incentives at Nenh Industrial Cluster

7 years of raw land tax exemption.

ch.jpg

 
 

Detailed Planning Map of Nenh Industrial Cluster

Investment Process at Nenh Industrial Cluster

1. Select land lease location

2. Negotiate lease agreement and make a deposit

3. Establish a company and prepare investment documents

4. Obtain an Investment Registration Certificate

5. Sign a land lease agreement

6. Land handover

7. Receive land-use rights certificate

8. Apply for construction permits

9. Build and commence operations

Land Rent and Other Costs at Nenh Industrial Cluster

Land rent with infrastructure: 100 USD/m²/lease cycle

Raw land tax: In accordance with state regulations

Management fee: 0.35 USD/m²/year

​Electricity Price:

l Off-peak hours: 1,037 VND/kWh

l Normal hours: 1,604 VND/kWh

l Peak hours: 2,959 VND/kWh

Clean water price: 13,400 VND/m³

​Wastewater treatment fee: 0.42 USD/m³

​Telecommunication fees: According to the rates of telecom providers at the time of installation.

The above prices and fees do not include VAT and are subject to change. Please contact IIP for the latest updates.

Contact Information:

​Partners interested in leasing land to set up factories at Nenh Industrial Cluster, please contact the hotline: 1900.888.858 or email: [email protected].

 