NAM HA 2 INDUSTRIAL CLUSTER – LAM DONG
Address: Tra Tan Commune, Lam Dong Province
Operational period: 2019 – 2069
Total area: 74 ha
Land rental price: 60 USD/m² (excluding VAT)

Strategic location and regional connectivity

  • About 102 km from Cai Mep – Thi Vai Port;
  • About 127 km from Phan Thiet Airport – Binh Thuan;
  • About 117 km from Tan Son Nhat International Airport;
  • About 106 km from Phan Thiet Railway Station.

Infrastructure of Nam Ha 2 Industrial Cluster

Power supply system
The project is connected to the 110 kV – 22 kV power grid, with an internal substation operating stably to support large-scale industrial production.

Water supply system
Water supply capacity for the whole cluster is about 5,000 m³/day.

Wastewater treatment system
The centralized wastewater treatment system meets environmental standards, integrated within a modern and green industrial infrastructure.

Telecommunication system
The industrial cluster is equipped with a modern telecommunications network that meets international standards, fully and promptly meeting all domestic and international communication needs.

Fire protection system
Equipped with a three-layer security system (fence, CCTV, access control) and a modern fire protection system operating 24/7.

Investment-attracting industries in Nam Ha 2 Industrial Cluster

  • Smart automobile industry;
  • Electronics & components;
  • Food & beverage processing;
  • Smart home appliances;
  • Mechanical engineering & light manufacturing;
  • Renewable energy.

Investment incentives in Nam Ha 2 Industrial Cluster
According to legal regulations.

  • Construction density: 70%
  • Maximum number of floors: 3
  • Land use coefficient: 2.1 times

Land rental price and other costs in Nam Ha 2 Industrial Cluster

  • Infrastructure rental: 60 USD/m² (excluding VAT)
  • Management fee: 0.5 USD/m²/year (excluding VAT)
  • Electricity price: As regulated by the provider
  • Water price: As regulated by the provider
  • Wastewater treatment fee: As regulated by the provider
  • Telecommunication charges: According to provider regulations at the time of installation

Contact
For partners interested in leasing land to build factories in Nam Ha 2 Industrial Cluster, Lam Dong Province, please contact:
Hotline: 1900.888.858
Email: [email protected]