KCNPhu Tho
NAM BINH XUYEN GREEN PARK INDUSTRIAL ZONE – PHU THO

1 photos
Key facts
- Total area
- 295.7 ha
- Rent
- 140*
- Occupancy
- Not updated
- Year established
- 2025
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
NAM BINH XUYEN GREEN PARK INDUSTRIAL ZONE – PHU THO
Address: Binh Nguyen Commune and Xuan Lang Commune, Phu Tho Province
Operational period: 2021 – 2071
Total area: 296 hectares
Land lease price: 140 USD/m²/lease cycle (excluding VAT)
Strategic Location & Regional Connectivity
Nam Binh Xuyen Green Park Industrial Zone is strategically located adjacent to Hanoi, acting as a gateway connecting the Northwest provinces to the capital and the Red River Delta. It is also a central hub for international goods distribution and circulation:
- About 40 km from Hanoi city center
- Only 22 km from Noi Bai International Airport
- About 65 km from Thai Nguyen City
- About 42 km from Bac Ninh City
- About 160 km from Hai Phong Port
- About 125 km from Ninh Binh City
- Convenient access to the Hanoi - Hai Phong Expressway and national highways QL5A, QL338, QL39A
Investment Sectors
- Electrical industry
- Electronics and telecommunications
- Mechanical engineering, automotive parts and components
- Production of medical and optical equipment
- Pharmaceutical and cosmetic manufacturing
- Building materials production
- Processing of agricultural, forestry, and aquatic products
Infrastructure
Power Supply System
- Equipped with solar power generation and distribution system within the industrial zone
- Capacity: 11x63MVA via EVN's 110/22kV step-down substation
Water Supply System
- Water treatment and supply plant with a capacity of 36,000 m³/day (phase 1) and 22,000 m³/day (phase 2)
Wastewater Treatment System
- Wastewater treatment plant with an initial capacity of 15,000 m³/day, scalable according to project phases
Transportation Infrastructure
- Main roads: 50m wide
- Internal roads: 14m–46m wide
Investment Incentives
- 2-year corporate income tax exemption
- 50% reduction for the next 4 years
Investor Support
The IZ developer provides full support for secondary investors, including:
- Investment certificate registration
- Personnel registration
- Company seal registration and licensing
- Tax code registration
Investment Process
1. Site selection
2. Sign principle lease agreement (for Korean legal entities)
3. Sign land lease contract
4. Apply for investment license & establish enterprise
5. Sign land lease (transfer leaseholder to local legal entity)
6. Receive land use certificate
7. Choose design firm, draft & approve basic design
8. Apply for construction permit
9. Groundbreaking
10. Select supervision & construction units
11. Build and complete project
12. Apply for completion certificate

Land Lease Price & Fees
- Land lease: 140 USD/m²/lease cycle (excluding VAT)
- Land tax: According to government regulations
- Management fee: 0.6 USD/m²/year
- Water price: 0.6 USD/m³
- Wastewater treatment fee: 0.5 USD/m³
(*All prices exclude VAT and may change. Please contact IIP for the latest updates.)
Contact:
Hotline: 1900.888.858
Email: [email protected]


Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.2425, 105.6524
Videos of this park
This park has no videos yet