CCNDong Nai

MINH HUNG 2 INDUSTRIAL CLUSTER - DONG NAI

1 photos

Key facts

Total area
32.7 ha
Rent
60*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

MINH HUNG 2 INDUSTRIAL CLUSTER - DONG NAI 

​Address: Bu Dang Commune, Dong Nai Province

Operation period: 2020 – 2070
Total area: 32.7 ha
Land rental price: 60 USD/m² (excluding VAT)

Strategic location and regional connectivity

  • About 146 km from Ho Chi Minh City center;
  • About 147 km from Tan Son Nhat International Airport;
  • About 156 km from Cat Lai Port;
  • About 188 km from Cai Mep Port.

Infrastructure of Minh Hung 2 Industrial Cluster

Power supply system
Electricity is stably supplied from the national grid through the 110/22kV Minh Hung substation, ensuring continuous power for all enterprises in the cluster.

Water supply system
Clean water is supplied by the centralized water supply system of Bu Dang District through the main pipeline network along internal roads. The supply capacity meets all production and domestic needs of enterprises.

Wastewater treatment system
The cluster has a separated drainage system for rainwater and wastewater. Industrial wastewater is collected and conveyed to the centralized treatment plant, meeting National Environmental Standard A before being discharged.

Telecommunication system
Telecommunication services are provided by major network operators, offering high-speed internet, fixed-line telephone, and modern IT solutions to support efficient enterprise operations.

Investment-attracted industries at Minh Hung 2 Industrial Cluster

  • Manufacturing, assembling, and repairing machinery, equipment, and spare parts for agricultural and rural production;
  • Agricultural product processing and food production;
  • Consumer goods manufacturing.

Investment incentives at Minh Hung 2 Industrial Cluster
In accordance with current legal regulations.

Construction density: 70%
Maximum building height: 3 floors
Land use coefficient: 2.1 times

Land lease and other fees at Minh Hung 2 Industrial Cluster

  • Infrastructure rental price: 60 USD/m² (excluding VAT)
  • Management fee: 0.5 USD/m²/year (excluding VAT)
  • Wastewater treatment fee: 0.4 USD/m³
  • Water price: 0.4 USD/m³
  • Electricity price: According to EVN regulations

Contact
For inquiries regarding land lease or factory establishment in Minh Hung 2 Industrial Cluster - Dong Nai Province, please contact Hotline: 1900.888.858 or Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

11.7835, 107.1651

Videos of this park

Empty

This park has no videos yet

?