KCNDong Nai

LONG DUC INDUSTRIAL PARK PHASE 2 - DONG NAI

1 photos

Key facts

Total area
293.9 ha
Rent
Not updated
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

Overview

LONG DUC INDUSTRIAL PARK PHASE 2 - DONG NAI

Address: Long Duc Commune, Long Thanh District, Dong Nai Province
Operation Period: 2025 - 2075
Total Area: 293.9 ha
Price: 170 - 180 USD/m² (excluding VAT)

Strategic Location & Regional Connectivity

  • Approximately 40 km from Long Thanh Airport
  • Approximately 37 km from Cat Lai Port
  • Approximately 25 km from Bien Hoa City Center
  • Approximately 55 km from Ho Chi Minh City Center
  • Approximately 52 km from Tan Son Nhat International Airport
  • Approximately 37 km from Cai Mep Port

Infrastructure of Long Duc Industrial Park Phase 2

Power Supply System

The power supply source for the step-down substation is a 110kV transmission line from the 220/110kV An Phuoc substation. A 110/22kV-1x63MVA intermediate substation will be built to serve the entire industrial park.

Water Supply System

Water supply capacity: approximately 9,200 m³/day-night.

Wastewater Treatment System

Wastewater treatment plant capacity: approximately 6,000 m³/day-night.

Fire Protection System

D100 fire hydrants are installed along the roads within the industrial park at 150-meter intervals, with a total of 50 fire hydrants.

Telecommunication System

A 2,400x2 copper cable will be extended from the Long Thanh Post Office to Long Duc Industrial Park Phase 2. Internal network cables will be connected to distribution cabinets and junction boxes.

Investment Sectors in Long Duc Industrial Park Phase 2

A multi-sector industrial park focusing on:

  • High-tech industries
  • Supporting industries
  • Eco-friendly industries
  • Labor-intensive high-tech sectors
  • Logistics and auxiliary industries

Investment Incentives in Long Duc Industrial Park Phase 2

  • Corporate income tax exemption for the first 2 years
  • 50% tax reduction for the following 4 years

Land Rental & Other Costs in Long Duc Industrial Park Phase 2

  • Infrastructure rental price: 170 - 180 USD/m² (excluding VAT)
  • Infrastructure management & maintenance fee: 0.7 USD/m²/year (excluding VAT)
  • Electricity price: As per the supplier's regulations
  • Water price: As per the supplier's regulations
  • Wastewater treatment fee: As per the supplier's regulations
  • Telecommunication charges: As per the supplier's rates at the time of installation

Contact Information

For land leasing inquiries for factory setup at Long Duc Industrial Park Phase 2, Dong Nai Province, please contact:
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

10.8349, 106.9764

Videos of this park

Empty

This park has no videos yet

?