KCNDong Nai
LONG DUC INDUSTRIAL PARK PHASE 2 - DONG NAI

1 photos
Key facts
- Total area
- 293.9 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
LONG DUC INDUSTRIAL PARK PHASE 2 - DONG NAI
Address: Long Duc Commune, Long Thanh District, Dong Nai Province
Operation Period: 2025 - 2075
Total Area: 293.9 ha
Price: 170 - 180 USD/m² (excluding VAT)
Strategic Location & Regional Connectivity
- Approximately 40 km from Long Thanh Airport
- Approximately 37 km from Cat Lai Port
- Approximately 25 km from Bien Hoa City Center
- Approximately 55 km from Ho Chi Minh City Center
- Approximately 52 km from Tan Son Nhat International Airport
- Approximately 37 km from Cai Mep Port
Infrastructure of Long Duc Industrial Park Phase 2
Power Supply System
The power supply source for the step-down substation is a 110kV transmission line from the 220/110kV An Phuoc substation. A 110/22kV-1x63MVA intermediate substation will be built to serve the entire industrial park.
Water Supply System
Water supply capacity: approximately 9,200 m³/day-night.
Wastewater Treatment System
Wastewater treatment plant capacity: approximately 6,000 m³/day-night.
Fire Protection System
D100 fire hydrants are installed along the roads within the industrial park at 150-meter intervals, with a total of 50 fire hydrants.
Telecommunication System
A 2,400x2 copper cable will be extended from the Long Thanh Post Office to Long Duc Industrial Park Phase 2. Internal network cables will be connected to distribution cabinets and junction boxes.
Investment Sectors in Long Duc Industrial Park Phase 2
A multi-sector industrial park focusing on:
- High-tech industries
- Supporting industries
- Eco-friendly industries
- Labor-intensive high-tech sectors
- Logistics and auxiliary industries
Investment Incentives in Long Duc Industrial Park Phase 2
- Corporate income tax exemption for the first 2 years
- 50% tax reduction for the following 4 years
Land Rental & Other Costs in Long Duc Industrial Park Phase 2
- Infrastructure rental price: 170 - 180 USD/m² (excluding VAT)
- Infrastructure management & maintenance fee: 0.7 USD/m²/year (excluding VAT)
- Electricity price: As per the supplier's regulations
- Water price: As per the supplier's regulations
- Wastewater treatment fee: As per the supplier's regulations
- Telecommunication charges: As per the supplier's rates at the time of installation
Contact Information
For land leasing inquiries for factory setup at Long Duc Industrial Park Phase 2, Dong Nai Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
10.8349, 106.9764
Videos of this park
This park has no videos yet