CCNNinh Binh
LE HO INDUSTRIAL CLUSTER – NINH BINH

1 photos
Key facts
- Total area
- 75 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
Overview
LE HO INDUSTRIAL CLUSTER – NINH BINH
Address: Le Ho Ward, Ninh Binh Province
Operation period: 2022 – 2072
Total area: 75 ha
Land lease price: 86 – 88 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- Located on National Highway 38, about 3 km from the Vuc Vong interchange of the Phap Van – Cau Gie Expressway;
- About 50 km from Hanoi City;
- About 80 km from Noi Bai International Airport;
- About 114 km from Hai Phong Port;
- About 14 km from Phu Ly City.
Infrastructure of Le Ho Industrial Cluster
Electricity Supply System
New construction of a 320 kVA – 22/0.4 kV substation.
Wastewater Treatment System
One wastewater treatment plant with a capacity of 2,100 m³/day-night.
One automatic, continuous wastewater monitoring system, connected directly to the Department of Natural Resources and Environment of Ha Nam Province, monitoring flow rate, temperature, pH, TSS, COD, and ammonium.
Traffic System
Internal roads with a planned width of 20.5 m – 17.5 m.
East and west sides of the cluster are connected by two roads at the project boundary, linking to two major urban areas with planned worker housing.
The west side of the project includes a planned parking area and fuel station.
Key Industries Attracting Investment
- Mechanical manufacturing and assembly;
- Electrical and electronic equipment;
- Textiles and garments, raw materials, and footwear production;
- Agricultural and food processing;
- Consumer goods production;
- Medical equipment and instruments;
- Supporting industries, etc.
Investment Incentives
According to current legal regulations.
Construction Density: 70%
Maximum Building Height: 5 floors
Land Use Coefficient: 3.5 times
Land Lease Price and Related Fees
- Infrastructure lease price: 86 – 88 USD/m² (excluding VAT)
- Wastewater treatment fee: 12,000 VND/m³
- Clean water price: According to current regulations
- Electricity price: According to current regulations
- Infrastructure management fee: 0.6 USD/m²/year (excluding VAT)
Contact
For land lease and factory development at Le Ho Industrial Cluster, Ninh Binh Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.6381, 105.8695
Videos of this park
This park has no videos yet