CCNThai Nguyen
HUYEN TUNG 2 INDUSTRIAL CLUSTER - THAI NGUYEN

1 photos
Key facts
- Total area
- 30 ha
- Rent
- 50*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
HUYEN TUNG 2 INDUSTRIAL CLUSTER - THAI NGUYEN
Address: Duc Xuan Ward, Thai Nguyen Province
Operation Period: 50 years from the date the project is granted land by the State
Total Area: 30 ha
Land Lease Price: 50 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 167 km from Hanoi city center
- About 140 km from Noi Bai International Airport
- About 272 km from Hai Phong Port
- About 168 km from Huu Nghi Border Gate
Infrastructure of Huyen Tung 2 Industrial Cluster
Power Supply
Connected to the existing 110kV or 22kV lines, with sufficient capacity to ensure 24/7 stable power for both production and daily activities.
Water Supply
Clean water is supplied from Bac Kan City’s water plant with a projected capacity of 377.6 m³/day. Includes a storage tank and intermediate pumping station.
Wastewater Treatment
Central wastewater treatment plant with a capacity of 1,000 m³/day. Treated water must meet Column A standards (QCVN 40:2011/BTNMT) before being discharged into the Cau River. Sub-factories must pre-treat wastewater to meet Column B before connecting to the central system.
Internal Road System
Wide internal roads, heavy load-bearing, with lighting. Main road connects to Huyen Tung – My Thanh road.
Fire Protection System
Professional firefighting system with hydrants every 100–200m and a 100m³ water tank for fire prevention.
Telecommunications & Solid Waste Management
Equipped with fiber-optic internet and high-speed connection. Waste is collected and treated according to regulations.
Investment Sectors Encouraged in Huyen Tung 2 Industrial Cluster
- Processing of agricultural, forestry products, beverages, food, medicinal herbs
- Textile, footwear, consumer goods
- Manufacturing and assembly of electronic and mechanical components
- Other sectors (priority for advanced technology, clean production, and local labor employment)
Investment Incentives in Huyen Tung 2 Industrial Cluster
According to legal regulations
Land Lease Price and Related Costs
- Infrastructure land lease: 50 USD/m²/lease cycle (excluding VAT)
- Management fee: 0.5 USD/m²/year (excluding VAT)
- Wastewater treatment fee: According to provider’s rate
- Electricity price: As regulated by EVN
- Clean water price: According to local water supplier
- Telecommunication service fee: According to provider’s regulation
Contact
For land lease and factory investment in Huyen Tung 2 Industrial Cluster, Thai Nguyen Province, please contact:
Hotline: 1900.888.858 | Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
22.1556, 105.8621
Videos of this park
This park has no videos yet