CCNBac Ninh
HUONG SON 2 INDUSTRIAL CLUSTER - BAC NINH

1 photos
Key facts
- Total area
- 65 ha
- Rent
- 110*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
HUONG SON 2 INDUSTRIAL CLUSTER - BAC NINH
Address: Kep Commune, Bac Ninh Province
Operation Period: 50 years from the date of land handover
Total Area: 65 ha
Land Lease Price: 110 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 60 km from Hanoi city center;
- About 12 km from Bac Giang city center;
- About 65 km from Noi Bai International Airport;
- About 95 km from Hai Phong Port;
- About 104 km from Huu Nghi International Border Gate.
Infrastructure of Huong Son 2 Industrial Cluster
Power Supply System
Electricity is supplied from the 35 kV medium-voltage grid in the Huong Son area, sourced from the 110 kV Lang Giang substation.
Water Supply System
Water is supplied from Lang Giang Water Plant with a capacity of 10,000 m³/day-night.
Wastewater Treatment System
The centralized wastewater treatment plant has a designed capacity of 1,000 m³/day-night, applying a combined biological and physicochemical treatment technology to meet QCVN 40:2011/BTNMT (Column A) standards before discharge.
Telecommunication System
Major providers such as VNPT, Viettel, and FPT offer internet, fixed-line, and high-speed data transmission services.
Investment Sectors at Huong Son 2 Industrial Cluster
- Electricity, electronics, telecommunications;
- Mechanical engineering;
- Garment and textile;
- Medical equipment and pharmaceuticals;
- Agricultural, forestry, and food processing;
- Packaging production;
- Processing and manufacturing industries;
- Factory leasing;
- Supporting industries.
Investment Incentives at Huong Son 2 Industrial Cluster
According to current legal regulations.
Construction Density: 70%
Maximum Building Height: 3 floors
Land Use Coefficient: 2.1 times
Land Lease Price and Other Fees
Infrastructure lease price: 110 USD/m² (excluding VAT)
Management fee: 0.5 USD/m²/year (excluding VAT)
Water price: 0.4 USD/m³
Wastewater treatment fee: 0.35 USD/m³
Electricity price: According to the provider’s regulation
Telecommunication charges: According to the provider’s regulation
Contact
For partners seeking to lease land to build manufacturing facilities in Huong Son 2 Industrial Cluster, Bac Ninh Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.4012, 106.2901
Videos of this park
This park has no videos yet