HONG PHUC – HUNG LONG INDUSTRIAL CLUSTER – HAI PHONG

1 photos

Key facts

Total area
49.79 ha
Rent
90*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

HONG PHUC – HUNG LONG INDUSTRIAL CLUSTER – HAI PHONG

Address: Hong Chau Commune, Khuc Thua Du Commune, Hai Phong City
Operation period: 2020 – 2070
Total area: 49.79 ha
Land rental price: 90 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 83 km from Hanoi city center;
  • About 102 km from Noi Bai International Airport;
  • About 83 km from Hai Phong Port;
  • About 228 km from Huu Nghi Border Gate.

Infrastructure of Hong Phuc – Hung Long Industrial Cluster

Power Supply System
Electricity is supplied from the national grid via the regional Ninh Giang medium-voltage substation, with 22kV connection available up to factory boundaries.

Water Supply System
Clean water is supplied from the district water plant, ensuring stable flow for industrial production and daily use.

Wastewater Treatment System
The industrial cluster is equipped with a separate wastewater collection system. Industrial wastewater must be preliminarily treated at each factory before being transferred to the centralized wastewater treatment plant of the cluster, meeting Class A standards before discharge.

Telecommunication System
Modern telecommunication infrastructure with high-speed fiber-optic network and full 5G coverage, ready to support smart manufacturing enterprises.

Investment Attraction Sectors

  • Agricultural and food processing;
  • Supporting industries;
  • Light industries and environmentally friendly projects.

Investment Incentives
In accordance with current legal regulations.

Construction density: 70%
Maximum building height: 3 floors
Land use coefficient: 2.1 times

Land Rental Price and Fees
Infrastructure rental price: 90 USD/m² (excluding VAT)
Management fee: 0.5 USD/m²/year (excluding VAT)
Electricity price: According to EVN regulations
Water price: 0.4 USD/m³
Wastewater treatment fee: 0.3 USD/m³
Telecommunication fee: According to supplier’s regulations at installation time

Contact
For partners wishing to lease land and build production factories at Hong Phuc – Hung Long Industrial Cluster, Hai Phong City, please contact:
Hotline: 1900.888.858
Email: [email protected]