HOANH BO INDUSTRIAL CLUSTER – QUANG NINH

1 photos
Key facts
- Total area
- 69.4 ha
- Rent
- 95*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
HOANH BO INDUSTRIAL CLUSTER – QUANG NINH
Location: Thong Nhat Commune, Quang Ninh Province
Operation period: 2016 – 2066
Total area: 69.4 ha
Land rental price: 95 USD/m² (excluding VAT)
Strategic location and regional connectivity
- About 15 km from Ha Long City Center;
- About 164 km from Hanoi City Center;
- About 183 km from Noi Bai International Airport;
- About 20 km from Cai Lan Port.
Infrastructure of Hoanh Bo Industrial Cluster
Internal traffic system
Main roads inside the cluster are 32 m wide with 4 lanes. Branch roads are 23 m wide with 2 lanes.
Power supply system
Electricity is provided from the 110/35/22kV substation. The high-voltage network is distributed along internal roads.
Water supply system
Clean water is supplied with a capacity of 30,000 m³/day from a centralized water plant. Water is delivered to factory fences via an international-standard pipeline system.
Wastewater treatment system
Wastewater is collected and treated at the cluster’s treatment plant using European technology to meet Grade A standard (QCVN 40-2011/BTNMT) before being discharged into the common drainage system. Treatment capacity is 2,900 m³/day.
Telecommunications system
Underground communication cables are installed and supplied to factory fences using international-standard systems.
Industries attracting investment in Hoanh Bo Industrial Cluster
- Equipment manufacturing and repair;
- Agricultural and forestry processing;
- Construction materials production;
- Consumer goods manufacturing.
Investment incentives in Hoanh Bo Industrial Cluster
According to legal regulations.
Construction density: 70%
Maximum height: 3 floors
Land use coefficient: 2.1 times
Land lease and related costs in Hoanh Bo Industrial Cluster
- Infrastructure rental price: 95 USD/m² (excluding VAT)
- Management and maintenance fee: 0.5 USD/m²/year (excluding VAT)
- Wastewater treatment fee: According to provider’s regulation
- Clean water price: According to provider’s regulation
- Electricity price: According to provider’s regulation
Contact
For land lease and factory development in Hoanh Bo Industrial Cluster, Quang Ninh Province, please contact:
Hotline: 1900.888.858
Email: [email protected]