CCNTay Ninh
HAI SON INDUSTRIAL CLUSTER – TAY NINH

1 photos
Key facts
- Total area
- 75 ha
- Rent
- 150*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
HAI SON INDUSTRIAL CLUSTER – TAY NINH
Address: Thanh Loi Commune, Tay Ninh Province
Operation period: 2020 – 2070
Total area: 75 ha
Land rental price: 150 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 51 km from Cat Lai Port;
- About 46 km from Hiep Phuoc Port;
- About 48 km from Tan Son Nhat International Airport;
- About 91 km from Long Thanh International Airport.
Infrastructure of Hai Son Industrial Cluster
Power Supply System
Power is supplied from the regional 110/22kV substation. Medium-voltage transmission lines are connected directly to factory fences, ensuring sufficient capacity for both heavy and light industrial production.
Water Supply System
Clean water is supplied from Ben Luc district water plant and Hai Son investor’s private water supply system, meeting production and fire-fighting requirements.
Wastewater Treatment System
A centralized wastewater treatment plant equipped with modern technology. Wastewater from factories must be preliminarily treated to standard before being discharged into the industrial cluster’s collection system for Class A treatment in accordance with environmental regulations.
Telecommunication System
A synchronized telecommunication infrastructure with underground high-speed fiber-optic network, providing full internet and fixed-line telephone services. Large subscriber capacity and comprehensive 5G coverage ensure stable connectivity for factories and digital management solutions.
Investment Attraction Sectors
- Building materials manufacturing;
- Precision engineering and machinery manufacturing;
- Electronics, refrigeration and telecommunication equipment;
- Agricultural and clean food processing.
Investment Incentives
In accordance with current legal regulations.
Construction density: 70%
Maximum building height: 3 floors
Land use coefficient: 2.1 times
Land Rental Price and Fees
Infrastructure development price: 150 USD/m² (excluding VAT)
Management fee: 0.5 USD/m²/year (excluding VAT)
Water price: 0.4 USD/m³
Wastewater treatment fee: 0.35 USD/m³
Electricity price: According to supplier’s regulations
Telecommunication fee: According to supplier’s regulations
Contact
For partners wishing to lease land and build production factories at Hai Son Industrial Cluster, Tay Ninh Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
10.7356, 106.4380
Videos of this park
This park has no videos yet