HAC DICH INDUSTRIAL CLUSTER – HO CHI MINH

1 photos
Key facts
- Total area
- 29.2 ha
- Rent
- 98*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
HAC DICH INDUSTRIAL CLUSTER – HO CHI MINH
Address: Tan Thanh Ward, Ho Chi Minh City
Operation period: 2006 – 2056
Total area: 29.2 ha
Land rental price: 98 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- About 65 km from Ho Chi Minh City center;
- About 62 km from Tan Son Nhat International Airport;
- About 31 km from Long Thanh International Airport;
- About 16 km from Cai Mep Port.
Infrastructure of Hac Dich Industrial Cluster
Power Supply System
Electricity is supplied from Hac Dich 110/22kV substation. The 22kV medium-voltage grid is extended directly to factory boundaries, ensuring stable power for heavy industrial equipment.
Water Supply System
Water is supplied from Toc Tien and Phu My Water Plants through a dedicated pipeline network, ensuring high-capacity water supply for the entire cluster.
Wastewater Treatment System
Wastewater is collected through a separate underground drainage system and treated at a centralized wastewater treatment plant using modern biological technology.
Telecommunication System
The entire cluster is equipped with underground fiber-optic infrastructure. As of 2026, the area is fully covered by 5G, supporting smart factory and digital transformation applications.
Investment Attraction Sectors
- Garment manufacturing;
- Footwear manufacturing;
- Mechanical engineering;
- Plastic products manufacturing;
- Agricultural processing.
Investment Incentives
- Corporate income tax exemption for the first 2 years and 50% reduction for the following 4 years;
- Construction density: 70%
- Maximum building height: 3 floors
- Land use coefficient: 2.1 times
Land Rental Price and Fees
- Infrastructure rental price: 98 USD/m² (excluding VAT)
- Management fee: 0.5 USD/m²/year (excluding VAT)
- Electricity price: According to EVN regulations
- Water price: 0.45 USD/m³
- Wastewater treatment fee: 0.3 USD/m³
- Telecommunication fee: According to supplier’s regulations at installation time
Contact
For partners wishing to lease land and build factories at Hac Dich Industrial Cluster, Ho Chi Minh City, please contact:
Hotline: 1900.888.858
Email: [email protected]