CCNHo Chi Minh City

HAC DICH INDUSTRIAL CLUSTER – HO CHI MINH

1 photos

Key facts

Total area
29.2 ha
Rent
98*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

HAC DICH INDUSTRIAL CLUSTER – HO CHI MINH 

Address: Tan Thanh Ward, Ho Chi Minh City
Operation period: 2006 – 2056
Total area: 29.2 ha
Land rental price: 98 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 65 km from Ho Chi Minh City center;
  • About 62 km from Tan Son Nhat International Airport;
  • About 31 km from Long Thanh International Airport;
  • About 16 km from Cai Mep Port.

Infrastructure of Hac Dich Industrial Cluster

Power Supply System
Electricity is supplied from Hac Dich 110/22kV substation. The 22kV medium-voltage grid is extended directly to factory boundaries, ensuring stable power for heavy industrial equipment.

Water Supply System
Water is supplied from Toc Tien and Phu My Water Plants through a dedicated pipeline network, ensuring high-capacity water supply for the entire cluster.

Wastewater Treatment System
Wastewater is collected through a separate underground drainage system and treated at a centralized wastewater treatment plant using modern biological technology.

Telecommunication System
The entire cluster is equipped with underground fiber-optic infrastructure. As of 2026, the area is fully covered by 5G, supporting smart factory and digital transformation applications.

Investment Attraction Sectors

  • Garment manufacturing;
  • Footwear manufacturing;
  • Mechanical engineering;
  • Plastic products manufacturing;
  • Agricultural processing.

Investment Incentives

  • Corporate income tax exemption for the first 2 years and 50% reduction for the following 4 years;
  • Construction density: 70%
  • Maximum building height: 3 floors
  • Land use coefficient: 2.1 times

Land Rental Price and Fees

  • Infrastructure rental price: 98 USD/m² (excluding VAT)
  • Management fee: 0.5 USD/m²/year (excluding VAT)
  • Electricity price: According to EVN regulations
  • Water price: 0.45 USD/m³
  • Wastewater treatment fee: 0.3 USD/m³
  • Telecommunication fee: According to supplier’s regulations at installation time

Contact

For partners wishing to lease land and build factories at Hac Dich Industrial Cluster, Ho Chi Minh City, please contact:
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

10.6433, 107.0897

Videos of this park

Empty

This park has no videos yet

?