Key facts
- Total area
- 75 ha
- Rent
- 110*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
HA THINH INDUSTRIAL CLUSTER - BAC NINH
Address: Hop Thinh Commune, Bao Dai Commune, Bac Ninh Province
Operation period: 2016 - 2066
Total area: 75 ha
Land lease price: 110 USD/m² (VAT not included)
Strategic location and regional connectivity
- About 46 km from Hanoi city center;
- About 23 km from Noi Bai International Airport;
- About 124 km from Hai Phong Port;
- About 151 km from Huu Nghi Border Gate.
Infrastructure of Ha Thinh Industrial Cluster
Power supply system
Power is continuously and stably supplied from the 110/22 KV substation and can be upgraded.
Water supply system
A clean water treatment plant is invested within Ha Thinh Industrial Cluster with a capacity of 5,000 m³/day, fully meeting the clean water demand of all enterprises in the cluster.
Wastewater treatment system
A centralized wastewater treatment system with a capacity of 3,000 m³/day and another system with a capacity of 15,000 m³/day operate with biological technology combined with MBR membrane.
Telecommunication system
The telecommunication cable system meets international standards, ready to provide 24–48 lines/ha. The underground fiber optic system is directly connected to enterprises’ fences.
Fire protection system
Water supply pipelines and fire hydrants are arranged along internal roads in the cluster, with a maximum distance of 150m between hydrants.
Industries attracting investment at Ha Thinh Industrial Cluster
Textiles, yarn, dyeing, washing, textile finishing, supporting industries for the textile sector; warehouse and factory leasing for production.
Investment incentives at Ha Thinh Industrial Cluster
- Corporate income tax rate: 17% applied for 10 years, with 2 years of exemption and a 50% reduction for the following 4 years.
- Construction density: 70%
- Maximum building height: 5 floors
- Land use coefficient: 3.5 times
Land lease price and fees at Ha Thinh Industrial Cluster
- Land lease with completed infrastructure: 95 USD/m² (VAT not included)
- Management fee: 0.5 USD/m²/year (VAT not included)
- Clean water price: 0.4 USD/m³
- Wastewater treatment fee: 0.4 USD/m³
- Electricity price: According to Bac Giang Power’s regulations
- Communication, waste treatment fees: According to service providers’ regulations.
Contact
For land lease inquiries at Ha Thinh Industrial Cluster, Bac Ninh Province, please contact Hotline: 1900.888.858 or Email: [email protected]