KCNNinh Binh
DONG VAN V INDUSTRIAL PARK - NINH BINH

1 photos
Key facts
- Total area
- 237 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- 2024
- Investor
- Not updated
- Management unit
- Not updated
Overview
DONG VAN V INDUSTRIAL PARK - NINH BINH
Address: Duy Tien Town, Ninh Binh Province
Operational period: 2024 - 2074
Total area: 237 hectares
Land lease price: 110 - 120 USD/m²/lease term
Strategic location and regional connectivity
Dong Van V Industrial Park is located adjacent to important transportation routes, making it convenient for goods transportation:
- Adjacent to a 42-meter-wide planned road and the Cau Gie - Ninh Binh expressway frontage road;
- About 20 km from Phu Ly city center;
- About 35 km from Hanoi city center;
- About 100 km from Noi Bai International Airport;
- About 100 km from Hai Phong seaport;
- About 200 km from Huu Nghi International Border Gate, Lang Son.
Investment-attracting industries at Dong Van V Industrial Park
- Mechanical engineering;
- Automobile manufacturing and supporting industries;
- Handicraft production industries;
- Power generation industries;
- Electronics industries;
- Food processing industries;
- Garment manufacturing industries;
- Packaging manufacturing industries.
Infrastructure at Dong Van V Industrial Park
Power supply system
- A new 110kV substation with a capacity of 2x63MVA will be constructed.
- Power for the industrial park is supplied from the 22kV power line after the 110kV Dong Van 3 and Dong Van V substations, according to the plan.
Water supply system
A water treatment and supply plant with a capacity of 10,000 m³/day and night.
Wastewater treatment system
A wastewater treatment plant with a treatment capacity of 7,500 m³/day and night.
Transportation system
- The main road is 48 meters wide, with a carriageway of 2x10.5 meters and sidewalks of 2x6 meters.
- Branch roads are 13-42 meters wide.
Telecommunications system
The telecommunications system meets international standards.
Investment incentives at Dong Van V Industrial Park
Corporate income tax exemption for the first 2 years and a 50% reduction in the next 4 years.
Land lease prices and other costs at Dong Van V Industrial Park
Land lease price: 110 - 120 USD/m²/lease cycle
Raw land rent: According to state regulations
Management fee: 0.7 USD/m²/year
Wastewater treatment fee: 0.7 USD/m³
Water price: 0.6 USD/m³
Electricity price: According to EVN’s rates
Telecommunication charges: According to the rates of the service provider at the time of installation
The above rates do not include VAT and may change. Please contact IIP for the latest updates.
Contact:
For partners interested in leasing land to build a factory at Dong Van V Industrial Park, please contact Hotline: 1900.888.858 or Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.6150, 105.9686
Videos of this park