KCNNinh Binh
DONG VAN 1 EXPANDED INDUSTRIAL PARK - NINH BINH

1 photos
Key facts
- Total area
- 149 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- 2021
- Investor
- Not updated
- Management unit
- Not updated
Overview
DONG VAN 1 EXPANDED INDUSTRIAL PARK - NINH BINH
Address: Duy Tien Town, Ninh Binh Province
Operation period: 2021 - 2071
Total area: 149 hectares
Land rental price: 110 USD/m²/lease cycle (excluding VAT)
Strategic location and regional connectivity
l South: adjacent to National Highway 38;
l West: adjacent to Cau Gie - Ninh Binh Expressway;
l About 35 km from Hanoi;
l About 101 km from Noi Bai International Airport;
l About 14 km from Phu Ly City center;
l About 95 km from Hai Phong Seaport;
l About 205 km from Huu Nghi Border Gate.
Strategic Location of Dong Van 1 Expanded Industrial Park
Industries attracting investment in Dong Van 1 Expanded Industrial Park
l Mechanical engineering, automobile manufacturing, and supporting industries;
l Handicraft production;
l Electrical and electronic component manufacturing;
l Food processing, garment manufacturing, packaging production, etc.
Infrastructure of Dong Van 1 Expanded Industrial Park
Power supply system: Minimum power capacity of 30 MVA.
Water supply system: Water supply plant capacity of 4,000 m³/day and night.
Wastewater treatment system: Wastewater treatment plant capacity of 2,500 m³/day and night.
Traffic system: Main road width of 32m, branch roads range from 17 to 24m wide.
Master plan of Dong Van 1 Expanded Industrial Park
Investment incentives at Dong Van 1 Expanded Industrial Park
l Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.
l Exemption of import duties on machinery and equipment for fixed asset formation.
l Land rent exemption for 3 years of basic construction and the following 11 years.
Investment support at Dong Van 1 Expanded Industrial Park
l Support for obtaining IRC and ERC certificates;
l Recruitment assistance;
l Consultation on workshop planning and construction;
l Support services and logistics.
Land rental prices and other costs at Dong Van 1 Expanded Industrial Park
Infrastructure rental price: 110 USD/m²/lease cycle (excluding VAT)
Land tax: Paid annually according to State regulations (11-year land tax exemption as per the Ha Nam Provincial Tax Department's regulation)
Wastewater treatment fee: 0.55 USD/m³ (excluding VAT)
Water price: 0.5 USD/m³ (excluding VAT)
Electricity price:
l Normal hours: 0.063 USD/kWh
l Off-peak hours: 0.039 USD/kWh
l Peak hours: 0.11 USD/kWh
Management fee: 0.6 USD/m²/year (excluding VAT)
Contact:
For partners interested in renting land for factory construction at Dong Van 1 Expanded Industrial Park please contact the Hotline: 1900.888.858 or Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.6700, 105.9405
Videos of this park
This park has no videos yet