CCNPhu Tho

DONG THINH INDUSTRIAL CLUSTER – PHU THO

1 photos

Key facts

Total area
28 ha
Rent
100*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

DONG THINH INDUSTRIAL CLUSTER – PHU THO
Address: Song Lo Commune, Phu Tho Province
Operation Period: 2022 – 2072
Total Area: 28 ha
Land Lease Price: 100 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • Located on the Kunming – Lao Cai – Hanoi – Hai Phong – Quang Ninh economic corridor;
  • About 4 km from IC6 interchange of the Noi Bai – Lao Cai Expressway;
  • About 50 km from Noi Bai International Airport;
  • About 180 km from Hai Phong Port;
  • About 75 km from downtown Hanoi.

Infrastructure of Dong Thinh Industrial Cluster

Power Supply System
Power is provided stably and continuously from a 110/35/22 kV substation.

Water Supply System

  • A clean water plant with a capacity of 10,000 m³/day meets the entire cluster's demand.
  • Water pipelines are installed to reach the fence of each land plot.

Wastewater Treatment System
A treatment plant with a capacity of 1,500 m³/day is in place, with reserved land available for future capacity expansion.

Telecommunication System
Telecommunication cables meet international standards, supporting 24–48 lines/ha. Underground fiber-optic cables are connected directly to the factory fences.

Fire Protection System
Water supply and fire hydrants are installed along the internal roads with a maximum distance of 150 m between hydrants.

Targeted Investment Sectors

  • Supporting industries;
  • Textile and garment;
  • Footwear;
  • Multi-industry.

Investment Incentives
According to the law.

Construction Density: 60%
Maximum Building Height: 4 floors
Land Use Ratio: 2.4 times

Land Lease and Related Costs at Dong Thinh Industrial Cluster

  • Infrastructure-inclusive land lease price: 100 USD/m² (excluding VAT)
  • Infrastructure management and maintenance fee: 0.5 USD/m²/year (excluding VAT)
  • Wastewater treatment fee: 0.46 USD/m³
  • Telecommunication charges: As per provider at installation
  • Electricity price: According to EVN
  • Clean water price: 0.66 USD/m³

Contact
For partners interested in leasing land to build a factory in Dong Thinh Industrial Cluster, Phu Tho Province, please contact:
Hotline: 1900.888.858
Email: [email protected].

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.3776, 105.4330

Videos of this park

Empty

This park has no videos yet

?