CCNNghe An

DONG THAI INDUSTRIAL CLUSTER - NGHE AN

1 photos

Key facts

Total area
39.55 ha
Rent
55*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

DONG THAI INDUSTRIAL CLUSTER - NGHE AN

Address: Quang Chau Commune, Nghe An Province
Operation Period: 2025 – 2075
Total Area: 39.55 ha
Land Rental Price: 55 USD/m² (excluding VAT)

Strategic Location & Regional Connectivity:

  • About 36 km from Vinh City Center
  • About 44 km from Vinh International Airport
  • About 36 km from Vinh Railway Station
  • About 50 km from Cua Lo Seaport
  • About 216 km from Nam Can Border Gate

Infrastructure at Dong Thai Industrial Cluster:

Power Supply:
Electricity for the industrial cluster’s transformer stations is sourced from a 22 kV transmission line running through the area, originating from the 110 kV Dien Chau substation.

Water Supply:
Water supply capacity of about 3,000 m³/day.

Wastewater Treatment:
Wastewater treatment plant capacity is approximately 1,000 m³/day.

Telecommunications:
Internet and telephone lines are installed up to the project’s boundary.

Fire Protection System:
Complies with fire safety standards as regulated.

Key Investment Sectors:

  • Electronics, manufacturing of components and accessories for assembly industries and automobile parts
  • Yarn, textile, garment, and footwear production
  • Medical products and equipment manufacturing
  • Warehousing and logistics
  • Production of construction materials, new materials, precast concrete components
  • Supporting industries
  • Agricultural, forestry, and aquatic product processing

Investment Incentives:

In accordance with current legal regulations

Land Rental & Service Costs:

  • Infrastructure rental: 55 USD/m² (excluding VAT)
  • Clean water price: As per provider’s regulation
  • Telecommunications: Based on provider’s price at installation
  • Electricity price: As per provider’s regulation
  • Management and infrastructure maintenance fee: 0.5 USD/m²/year (excluding VAT)
  • Wastewater treatment fee: As per provider’s regulation

Contact:
For land lease inquiries to establish manufacturing facilities at Dong Thai Industrial Cluster, Nghe An Province, please contact:
Hotline: 1900.888.858 | Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

19.0093, 105.5374

Videos of this park

Empty

This park has no videos yet

?