DONG NAM INDUSTRIAL PARK – HO CHI MINH

1 photos
Key facts
- Total area
- 342 ha
- Rent
- 270*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
DONG NAM INDUSTRIAL PARK – HO CHI MINH
Address: Binh My Commune, Ho Chi Minh City
Operation period: 2008 – 2058
Total area: 342 ha
Land rental price: 270 USD/m² (VAT excluded)
Strategic location and regional connectivity
- About 25 km from Ho Chi Minh City center;
- About 20 km from Tan Son Nhat Airport;
- About 25 km from ICD Phuoc Long Port;
- About 42 km from Hiep Phuoc Port;
- About 32 km from Cat Lai Port.
Infrastructure of Dong Nam Industrial Park
Power supply
Electricity is stably provided by the internal power station with a capacity of 3 x 63 MVA (invested, operated, and maintained by Saigon VRG) and Tan Quy Substation 2 x 63 MVA, ensuring high-quality power supply to customer factories.
Water supply
Clean water is supplied from the internal Water Plant with a capacity of 10,000 m³/day-night and Thu Dau Mot Station with a capacity of 200,000 m³/day-night. The water source meets QCVN standards.
Wastewater treatment system
Industrial wastewater is collected and treated at the centralized treatment plant with a capacity of 8,500 m³/day-night, meeting Grade A standards under QCVN 40:2011/BTNMT before discharge into the environment.
Traffic system
The road system is spacious, meeting business needs:
- Main roads: 6 lanes, road width 40m;
- Internal roads: 1–4 lanes, road width 18–29m.
Saigon VRG supports additional road construction if required.
Investment sectors at Dong Nam Industrial Park
- Mechanical engineering and machinery manufacturing;
- Electronics and information technology;
- Pharmaceuticals, herbal medicine, medical drugs;
- Industrial chemicals, plastics, advanced rubber;
- Construction materials, interior decoration, sports equipment.
Investment incentives at Dong Nam Industrial Park
- Corporate income tax exemption for the first 2 years and 50% reduction for the following 4 years.
Construction density: 70%
Maximum building height: 3 floors
Land use coefficient: 2.1 times
Land rental and other costs at Dong Nam Industrial Park
- Infrastructure rental price: 270 USD/m² (VAT excluded)
- Management fee: 0.6 USD/m²/year (VAT excluded)
- Water price: 0.5 USD/m³
- Wastewater treatment fee: 0.35 USD/m³
- Electricity price: As regulated by the supplier
- Telecommunication charges: As regulated by the supplier
Contact
Partners interested in leasing land for factory construction in Dong Nam Industrial Park, Ho Chi Minh City, please contact Hotline: 1900.888.858 or Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
10.9670, 106.6232
Videos of this park
This park has no videos yet