- Total area
- 105.6 ha
- Rent
- 55*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
DONG BAC SONG CAU INDUSTRIAL PARK – DAK LAK
Address: Xuan Loc Commune, Dak Lak Province
Operation Period: 2003 – 2053
Total Area: 105.6 ha
Land Lease Price: 55 USD/m² (excluding VAT)
Strategic Location and Regional Connectivity
- Located on National Highway 1D;
- About 20 km from Quy Nhon Port;
- About 30 km from Dieu Tri Railway Station;
- About 70 km from Tuy Hoa Railway Station;
- About 50 km from Phu Cat Airport;
- About 80 km from Tuy Hoa Airport.
Infrastructure of Dong Bac Song Cau Industrial Park
- Power Supply System: Electricity is sourced from the 35kV power grid connected to the 110kV substation with large capacity, provided by EVN.
- Water Supply System: The system fully meets both domestic and industrial needs with large capacity, supplied directly from the industrial park’s water plant.
- Wastewater Treatment System: Wastewater from factories and domestic activities is treated at a centralized facility with large capacity before being discharged into the environment.
- Telecommunication System: Equipped with an international-standard telecommunication network, ensuring both domestic and international connectivity.
Investment Sectors in Dong Bac Song Cau Industrial Park
- Coconut-based products;
- Processing of agricultural, forestry, and aquatic products for export;
- Food and beverage processing;
- High-quality construction materials;
- Shoes, leather, garments, handicrafts;
- Plastics, chemicals;
- Wood, paper;
- Mechanical engineering, electronics.
Investment Incentives in Dong Bac Song Cau Industrial Park
- Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.
Construction Density: 60%
Maximum Building Height: 3 floors
Land Use Coefficient: 1.8 times
Land Lease and Service Fees in Dong Bac Song Cau Industrial Park
- Infrastructure rental price: 55 USD/m² (excluding VAT)
- Management fee: 0.5 USD/m²/year (excluding VAT)
- Electricity price: According to EVN’s pricing
- Water price: 0.4 USD/m³
- Wastewater treatment fee: 0.4 USD/m³
- Telecommunication charges: According to the provider’s rates at installation time
Contact
For land lease and factory setup at Dong Bac Song Cau Industrial Park, Dak Lak Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
13.5925, 109.2489
Videos of this park
This park has no videos yet