KCNPhu Tho

DOAN HUNG INDUSTRIAL PARK - PHU THO

1 photos

Key facts

Total area
495 ha
Rent
125*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

DOAN HUNG INDUSTRIAL PARK - PHU THO

Address: Doan Hung Commune, Tay Coc Commune, Phu Tho Province
Operation period: 2025 - 2075
Total area: 495 ha
Land lease price: 125 USD/m² (excluding VAT)

Strategic location and regional connectivity

  • About 123 km from Hanoi city center;
  • About 98 km from Noi Bai International Airport;
  • About 43 km from Viet Tri City;
  • About 252 km from Hai Phong Port.

Infrastructure of Doan Hung Industrial Park

Power supply system
Electricity is stably supplied from the national grid via the nearby 110/22kV transformer station. Power lines are installed underground to ensure safety and aesthetics.

Water supply system
Clean water is fully supplied from the regional or industrial park water plant. Water pipelines are installed along internal roads, ready for connection to tenants’ facilities.

Wastewater treatment system
A centralized wastewater treatment station is invested and built with large capacity, applying advanced technology to ensure all wastewater meets national environmental standards before discharge.

Telecommunication system
The telecommunication network is fully equipped with fiber optics, providing high-speed Internet, telephone, and stable data transmission services.

Fire prevention and fighting system
A synchronous fire prevention system is installed, including fire hydrants along main roads, fully compliant with current fire safety regulations.

Investment-attracted industries in Doan Hung Industrial Park

  • Automobile industry and supporting industries;
  • High-tech industry;
  • Clean industry using renewable energy.

Investment incentives in Doan Hung Industrial Park
Corporate income tax exemption for the first 2 years and a 50% tax reduction for the following 4 years.

Construction density: 70%
Maximum building height: 5 floors
Land use coefficient: 3,5 times 

Land lease and related fees in Doan Hung Industrial Park
Infrastructure rental price: 125 USD/m² (excluding VAT)
Infrastructure management and maintenance fee: 0.5 USD/m²/year (excluding VAT)
Wastewater treatment fee: 0.4 USD/m³
Electricity price: According to EVN’s pricing
Clean water price: 0.4 USD/m³
Telecommunication fee: According to provider’s pricing

Contact
Enterprises interested in leasing land to build factories in Doan Hung Industrial Park - Phu Tho Province please contact Hotline: 1900.888.858 or Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.6638, 105.1336

Videos of this park

Empty

This park has no videos yet

?